Water Resources

Bull Run Filtration Facility
Bull Run Filtration Facility 1000 750 Southland Holdings

Completed in 2027 by Oscar Renda Contracting, the Bull Run Filtration Facility project consisted of constructing a new water treatment facility capable of producing up to 135 MGD. Subcontract scope…

read more
Southside Interceptor Project
Southside Interceptor Project 1000 750 Southland Holdings

Completed in 2024 by Oscar Renda Contracting, the Southside Interceptor project consisted of approximately 13,023 linear feet of 42-inch CIPP and 11,919 linear feet of 110-inch slipline. Project Details Owner:…

read more
Integrated Pipeline (IPL) Section 19 TXDOT Tunnel Crossing
Integrated Pipeline (IPL) Section 19 TXDOT Tunnel Crossing 1000 750 Southland Holdings

Completed in 2024 by Oscar Renda Contracting, the Integrated Pipeline (IPL) Section 19 TXDOT Tunnel Crossing project consisted of tunnel excavation crossing under Texas DOT highways and water line installation.…

read more
Romeo Arm Lining Segment 5
Romeo Arm Lining Segment 5 1000 750 Southland Holdings

Completed in 2025 by Oscar Renda Contracting, the Romeo Arm Lining Segment 5 project consisted of a new access shaft and control structure at the ITC Corridor. Scope of work…

read more
Atoka Raw Water Pipeline
Atoka Raw Water Pipeline 1000 750 Southland Holdings

Completed in 2025 by Oscar Renda Contracting, the Atoka Raw Water Pipeline project consisted of approximately 69,827 linear feet of 72-inch welded steel water main and appurtenances. The scope of…

read more
Finished Water 1 Pipeline
Finished Water 1 Pipeline 1000 750 Southland Holdings

Completed in 2025 by Oscar Renda Contracting, the Finished Water 1 Pipeline project consisted of approximately 81,672 linear feet of 39-inch welded steel waterline, one pressure reducing vault, one isolation…

read more
Ashburton Reservoir Zone 2 Tanks
Ashburton Reservoir Zone 2 Tanks 1000 750 Southland Holdings

Completed in 2025 by Oscar Renda Contracting, the Ashburton Reservoir Zone 2 Tanks project consisted of two prestressed concrete finished water storage tanks each having a diameter of 434-feet, adjacent…

read more
I-35 Utility Relocation (I-35 Wet Split to US380)
I-35 Utility Relocation (I-35 Wet Split to US380) 1000 750 Southland Holdings

Completed in 2025 by Oscar Renda Contracting, the I-35 Utility Relocation (I-35 Wet Split to US380) project consisted of the open cut installation of PVC waterline and PVC wastewater sewer…

read more
Northwest Water Treatment Plant Expansion and Upgrades
Northwest Water Treatment Plant Expansion and Upgrades 1000 750 Southland Holdings

Completed in 2025 by Oscar Renda Contracting, the Northwest Water Treatment Plant Expansion and Upgrades project consisted of expanding conventional process treatment capacity, improving paid mixing, clarification, and filtration, and…

read more
Ashbridges Bay Treatment Plant Outfall
Ashbridges Bay Treatment Plant Outfall 1000 750 Southland Holdings

mpleted in 2025 by Oscar Renda Contracting, the Ashbridges Bay Treatment Plant Outfall project consisted of constructing a waterline outfall from the treatment plant to Ward 32 Beaches in East…

read more