Completed in 2025 by Oscar Renda Contracting, the Romeo Arm Lining Segment 5 project consisted of a new access shaft and control structure at the ITC Corridor. Scope of work includes removing sludge and sediment from the PCI-12A (from ITC corridor to 8-foot diameter bypass reach PCI-37), sliplining PCI12A (from ITC corridor to 8-foot diameter bypass reach PCI-37 with 9-foot, 2-inch GFR Pipe), and structural spray lining of the remaining portion of the PCI-37 8-foot bypass reach.
Project Details
- Owner: Macomb Interceptor Drain Drainage District
- Location: Sterling Heights, Michigan, United States
- Performed as: Oscar Renda Contracting, Inc.
- Project value: $44,207,788.00
- Completion Date: January 2025