Romeo Arm Lining Segment 5

Completed in 2025 by Oscar Renda Contracting, the Romeo Arm Lining Segment 5 project consisted of a new access shaft and control structure at the ITC Corridor. Scope of work includes removing sludge and sediment from the PCI-12A (from ITC corridor to 8-foot diameter bypass reach PCI-37), sliplining PCI12A (from ITC corridor to 8-foot diameter bypass reach PCI-37 with 9-foot, 2-inch GFR Pipe), and structural spray lining of the remaining portion of the PCI-37 8-foot bypass reach.

Project Details

  • Owner: Macomb Interceptor Drain Drainage District
  • Location: Sterling Heights, Michigan, United States
  • Performed as: Oscar Renda Contracting, Inc.
  • Project value: $44,207,788.00
  • Completion Date: January 2025