Water Resources

Large Valve Replacement
Large Valve Replacement 1000 750 Southland Holdings

This project included the removal and replacement of existing broken valves ranging size from 20-inch to 48-inch. All of this work took place in the street working around heavy traffic,…

read more
Rehab of Camino/McCamey Manholes
Rehab of Camino/McCamey Manholes 1000 750 Southland Holdings

This project included the complete replacement of 3 existing and far outdated brick manholes. All of them had structurally failed and one of them collapsed right before we started. Large…

read more
Sam Snead Recovery Project
Sam Snead Recovery Project 1000 750 Southland Holdings

Leak repair on a 12” water main, removed and replaced a section of pipe with fittings, new pipe material, and the use of line stops to isolate the section. Installed…

read more
Fred Hervey WRP IMP Project
Fred Hervey WRP IMP Project 1000 750 Southland Holdings

This Project consists of the installation of 1,600 linear feet of 30-inch pipe with multiple fittings, a pressure regulating valve and a connection to the plant headworks. This emergency work…

read more
Sunland Lift Station Header Repair
Sunland Lift Station Header Repair 1000 750 Southland Holdings

This project included removal and replacement of the main lift station header piping and all of the smaller lines coming from the pumps and wet well. This project was completed…

read more
Navajo Gallup Water Supply Project Block 4C-8
Navajo Gallup Water Supply Project Block 4C-8 1000 750 Southland Holdings

Project and scope of work included earthwork, installing 29 miles of 42-inch to 48-inch water transmission pipeline including air valves and blowoffs, wash crossings, and jack and bore crossings. Project…

read more
New Westminster Interceptor – Columbia Section Rehabilitation by Sliplining
New Westminster Interceptor – Columbia Section Rehabilitation by Sliplining 1000 750 Southland Holdings

Project and scope of work included rehabilitation of approximately 1,600m of reinforced concrete sewer sliplining and associated infrastructure along Columbia Street. Project Details Owner: Metro Vancouver Location: Vancouver, British Columbia,…

read more
Bois d’Arc Lake Treated Water Pipeline – Segment C
Bois d’Arc Lake Treated Water Pipeline – Segment C 1000 750 Southland Holdings

Project consisted of installing steel water line to include all appurtenances. Scope of work included 51,761 LF of 90-inch class 175 steel water line by open cut and 1,164 LF…

read more
Luckett Court Emergency Sewer Line Replacement
Luckett Court Emergency Sewer Line Replacement 1000 750 Southland Holdings

Project Details Owner: El Paso Water Utilities Location: El Paso, Texas, United States Performed as: Oscar Renda Contracting, Inc. Project value: $7,273,938.00 Completion Date: May 2024

read more
Red River Valley Water Supply: Transmission Pipeline East
Red River Valley Water Supply: Transmission Pipeline East 1000 750 Southland Holdings

Completed in 2026 by Oscar Renda Contracting, the Red River Valley Water Supply: Transmission Pipeline East project consisted of installing steel water pipeline, trenchless creek/river crossing and trenchless gas line…

read more