Sam Snead Recovery Project
Sam Snead Recovery Project 1000 750 Southland Holdings

Leak repair on a 12” water main, removed and replaced a section of pipe with fittings, new pipe material, and the use of line stops to isolate the section. Installed…

read more
Fred Hervey WRP IMP Project
Fred Hervey WRP IMP Project 1000 750 Southland Holdings

This Project consists of the installation of 1,600 linear feet of 30-inch pipe with multiple fittings, a pressure regulating valve and a connection to the plant headworks. This emergency work…

read more
Sunland Lift Station Header Repair
Sunland Lift Station Header Repair 1000 750 Southland Holdings

This project included removal and replacement of the main lift station header piping and all of the smaller lines coming from the pumps and wet well. This project was completed…

read more
Golden Ear Pipe Installation
Golden Ear Pipe Installation 1000 750 Southland Holdings

ORCC performed steel pipe installation as a subcontractor to the prime on this project. Specialized crews were required to assist with the 900 mm diameter steel pipe installed through an…

read more
Olmos Basin Central Watershed Sewer Relief Line C-3 Project
Olmos Basin Central Watershed Sewer Relief Line C-3 Project 1000 750 Southland Holdings

Project consisted of sanitary sewer pipeline installation under I35. Scope of work included 5,400 LF of 96-inch FRP open cut sanitary sewer pipeline, 640 LF of 60-inch bore, construction of…

read more
Trinity River Authority (TRA) Emergency Repair 82-Inch RCP-BCIR Segment IV
Trinity River Authority (TRA) Emergency Repair 82-Inch RCP-BCIR Segment IV 1000 750 Southland Holdings

Emergency repair of collapsed pipe with scope of work that includes 15-feet of excavation to the top of a 84-inch RCP for repairs, backfill, flowable fill, concrete encasement, clear and…

read more
Frontera Force Main Emergency Contract – Phase 1
Frontera Force Main Emergency Contract – Phase 1 1000 750 Southland Holdings

This design-build emergency installation of approximately 7,200’ of 36-inch FRP force main featured fast-paced, creative, and highly adaptive thinking to bring it to life. The design was completed from project…

read more
Frontera Force Main Emergency Contract – Phase 2
Frontera Force Main Emergency Contract – Phase 2 1000 750 Southland Holdings

Phase 2 focused on repairing, rehabilitating, replacing, and abandoning the existing force mains and all appurtenances. Improvements included residuals handling facilities and the demolition and decommissioning of existing facilities. The…

read more
Frontera Force Main Emergency Contract – Phase 3
Frontera Force Main Emergency Contract – Phase 3 1000 750 Southland Holdings

The final phase involved repairs to the force mains. Preconstruction services included developing the PMP and other management plans, regularly scheduled project meetings and workshops, constructability reviews, plant operations reviews,…

read more
Boone Interceptor
Boone Interceptor 1000 750 Southland Holdings

This project involved the removal and replacement of damaged section of 36-inch PVC sewer main with the use of fittings, line stops, and new pipe material. Project Details Owner: El…

read more