Bois d’Arc Lake Treated Water Pipeline – Segment C
Bois d’Arc Lake Treated Water Pipeline – Segment C 1000 750 Southland Holdings

Project consisted of installing steel water line to include all appurtenances. Scope of work included 51,761 LF of 90-inch class 175 steel water line by open cut and 1,164 LF…

read more
Red River Valley Water Supply: Transmission Pipeline East
Red River Valley Water Supply: Transmission Pipeline East 1000 750 Southland Holdings

Completed in 2026 by Oscar Renda Contracting, the Red River Valley Water Supply: Transmission Pipeline East project consisted of installing steel water pipeline, trenchless creek/river crossing and trenchless gas line…

read more
Elm Fork WTP Filter Complex, Phase 1
Elm Fork WTP Filter Complex, Phase 1 1000 750 Southland Holdings

Completed in 2027 by Oscar Renda Contracting, the Elm Fork WTP Filter Complex, Phase 1 project consisted of new filter complex and miscellaneous site work improvements. Scope of work includes…

read more
Water Treatment Plant No. 1 Improvements
Water Treatment Plant No. 1 Improvements 1000 750 Southland Holdings

Completed in 2027 by Oscar Renda Contracting, the Water Treatment Plant No. 1 Improvements project consisted of reconstruction and rehabilitation of existing water treatment plant. The scope of work consists…

read more
Montana East 36-inch Waterline Extension, Phase 2
Montana East 36-inch Waterline Extension, Phase 2 1000 750 Southland Holdings

Completed in 2024 by Oscar Renda Contracting, the Montana East 36-inch Waterline Extension, Phase II project consisted of 36-inch waterline extension located along Homestead Ranchos Real PS to Edgemere. Scope…

read more
Integrated Pipeline (IPL) Section 19 TXDOT Tunnel Crossing
Integrated Pipeline (IPL) Section 19 TXDOT Tunnel Crossing 1000 750 Southland Holdings

Completed in 2024 by Oscar Renda Contracting, the Integrated Pipeline (IPL) Section 19 TXDOT Tunnel Crossing project consisted of tunnel excavation crossing under Texas DOT highways and water line installation.…

read more
Romeo Arm Lining Segment 5
Romeo Arm Lining Segment 5 1000 750 Southland Holdings

Completed in 2025 by Oscar Renda Contracting, the Romeo Arm Lining Segment 5 project consisted of a new access shaft and control structure at the ITC Corridor. Scope of work…

read more
Atoka Raw Water Pipeline
Atoka Raw Water Pipeline 1000 750 Southland Holdings

Completed in 2025 by Oscar Renda Contracting, the Atoka Raw Water Pipeline project consisted of approximately 69,827 linear feet of 72-inch welded steel water main and appurtenances. The scope of…

read more
Finished Water 1 Pipeline
Finished Water 1 Pipeline 1000 750 Southland Holdings

Completed in 2025 by Oscar Renda Contracting, the Finished Water 1 Pipeline project consisted of approximately 81,672 linear feet of 39-inch welded steel waterline, one pressure reducing vault, one isolation…

read more
Ashburton Reservoir Zone 2 Tanks
Ashburton Reservoir Zone 2 Tanks 1000 750 Southland Holdings

Completed in 2025 by Oscar Renda Contracting, the Ashburton Reservoir Zone 2 Tanks project consisted of two prestressed concrete finished water storage tanks each having a diameter of 434-feet, adjacent…