Pipeline

Fred Hervey WRP IMP Project
Fred Hervey WRP IMP Project 1000 750 Southland Holdings

This Project consists of the installation of 1,600 linear feet of 30-inch pipe with multiple fittings, a pressure regulating valve and a connection to the plant headworks. This emergency work…

read more
Sunland Lift Station Header Repair
Sunland Lift Station Header Repair 1000 750 Southland Holdings

This project included removal and replacement of the main lift station header piping and all of the smaller lines coming from the pumps and wet well. This project was completed…

read more
Golden Ear Pipe Installation
Golden Ear Pipe Installation 1000 750 Southland Holdings

ORCC performed steel pipe installation as a subcontractor to the prime on this project. Specialized crews were required to assist with the 900 mm diameter steel pipe installed through an…

read more
New Westminster Interceptor – Columbia Section Rehabilitation by Sliplining
New Westminster Interceptor – Columbia Section Rehabilitation by Sliplining 1000 750 Southland Holdings

Project and scope of work included rehabilitation of approximately 1,600m of reinforced concrete sewer sliplining and associated infrastructure along Columbia Street. Project Details Owner: Metro Vancouver Location: Vancouver, British Columbia,…

read more
Bois d’Arc Lake Treated Water Pipeline – Segment C
Bois d’Arc Lake Treated Water Pipeline – Segment C 1000 750 Southland Holdings

Project consisted of installing steel water line to include all appurtenances. Scope of work included 51,761 LF of 90-inch class 175 steel water line by open cut and 1,164 LF…

read more
Red River Valley Water Supply: Transmission Pipeline East
Red River Valley Water Supply: Transmission Pipeline East 1000 750 Southland Holdings

Completed in 2026 by Oscar Renda Contracting, the Red River Valley Water Supply: Transmission Pipeline East project consisted of installing steel water pipeline, trenchless creek/river crossing and trenchless gas line…

read more
Elm Fork WTP Filter Complex, Phase 1
Elm Fork WTP Filter Complex, Phase 1 1000 750 Southland Holdings

Completed in 2027 by Oscar Renda Contracting, the Elm Fork WTP Filter Complex, Phase 1 project consisted of new filter complex and miscellaneous site work improvements. Scope of work includes…

read more
Water Treatment Plant No. 1 Improvements
Water Treatment Plant No. 1 Improvements 1000 750 Southland Holdings

Completed in 2027 by Oscar Renda Contracting, the Water Treatment Plant No. 1 Improvements project consisted of reconstruction and rehabilitation of existing water treatment plant. The scope of work consists…

read more
Montana East 36-inch Waterline Extension, Phase 2
Montana East 36-inch Waterline Extension, Phase 2 1000 750 Southland Holdings

Completed in 2024 by Oscar Renda Contracting, the Montana East 36-inch Waterline Extension, Phase II project consisted of 36-inch waterline extension located along Homestead Ranchos Real PS to Edgemere. Scope…

read more
Burnby Hospital Redevelopment Project, Phase 1
Burnby Hospital Redevelopment Project, Phase 1 1000 750 Southland Holdings

Completed in 2024 by Oscar Renda Contracting, the Burnby Hospital Redevelopment Project, Phase 1 project consisted of excavation, earth work, repairs to watermain and related work pertaining to the repairs,…

read more