Leak repair on a 12” water main, removed and replaced a section of pipe with fittings, new pipe material, and the use of line stops to isolate the section. Installed a new 12” tee with a 12” valve.
Project Details
- Owner: El Paso Water Utilities
- Location: El Paso, Texas, United States
- Performed as: Oscar Renda Contracting, Inc.
- Project value: $8,400,000.00
- Completion Date: March 2022



