Sunland Lift Station Header Repair

This project included removal and replacement of the main lift station header piping and all of the smaller lines coming from the pumps and wet well. This project was completed in a tight work space with many existing utilities and in a very short window before the station needed to be turned back on.

Project Details

  • Owner: El Paso Water Utilities
  • Location: El Paso, Texas, United States
  • Performed as: Oscar Renda Contracting, Inc.
  • Completion Date: 2021