Water Resources

Northgate & Rochelle Line Relocates – 20″ Waterline
Northgate & Rochelle Line Relocates – 20″ Waterline 1000 750 Southland Holdings

Completed in 2003 by Southland Contracting, the Northgate & Rochelle Line Relocations – 20” Waterline Project consisted of installing approximately 100 linear feet by jack and bore for 24-inch steel…

read more
Precinct Line Road
Precinct Line Road 1000 750 Southland Holdings

Completed in 2003 by Southland Contracting, the Precinct Line Road Project consisted of installing approximately 35 linear feet of 30-inch reinforced concrete (RCP) casing pipe by jack and bore methods.…

read more
Highway IH 10 (East of Peek Road to Fort Bend County Line)
Highway IH 10 (East of Peek Road to Fort Bend County Line) 1000 750 Southland Holdings

Completed in 2004 by Southland Contracting, the Highway IH 10 (East of Peek Road to Fort Bend County Line) Project consisted of installing 30-inch thru 48-inch reinforced concrete pipe (RCP)…

read more
Salado Creek/Dos Rios WRC Interceptor
Salado Creek/Dos Rios WRC Interceptor 1000 750 Southland Holdings

Completed in 2004 by Southland Contracting, the Salado Creek/Dos Rios WRC Interceptor Project consisted of installing four 35-foot tunnel shafts over 100 feet deep and a 15-foot diameter EPBM Tunnel…

read more
Capital Metro North Operations Metro Facility
Capital Metro North Operations Metro Facility 1000 750 Southland Holdings

Completed in 2004 by Southland Contracting, the Capital Metro North Operations Metro Facility Project consisted of installing approximately 70 linear feet of 90-inch reinforced concrete pipe (RCP) pipe. Project Details…

read more
Ullrich Water Transmission Plant Contract 3
Ullrich Water Transmission Plant Contract 3 1000 750 Southland Holdings

Completed in 2004 by Southland Contracting, the Ullrich Water Transmission Plant Contract 3 Project consisted of installing approximately 92 linear feet of 84-inch steel casing by bore and 92 linear…

read more
Buttercup Creek Interceptor
Buttercup Creek Interceptor 1000 750 Southland Holdings

Completed in 2004 by Southland Contracting, the Buttercup Creek Interceptor Project consisted of installing approximately 2,105 linear feet of tunnel for 36-inch fiberglass reinforced pipe, 1,035 linear feet of open…

read more
North Prong Creek Gravity Sewer
North Prong Creek Gravity Sewer 1000 750 Southland Holdings

Completed in 2004 by Southland Contracting, the North Prong Creek Gravity Sewer Project consisted of installing approximately 130 linear feet of 36-inch casing for 24-inch sewer line and 90 linear…

read more
Lake Fork 108″ Tunnel
Lake Fork 108″ Tunnel 1000 750 Southland Holdings

Completed in 2004 by Southland Contracting, the Lake Fork 108″ Tunnel Project consisted of installing approximately 162 linear feet of 144-inch liner plate tunnel for 108-inch reinforced concrete pipe (RCP)…

read more
MC-4A Parallel Interceptor Rehabilitiation Project – Joe Pool Lake
MC-4A Parallel Interceptor Rehabilitiation Project – Joe Pool Lake 1000 750 Southland Holdings

Completed in 2003 by Southland Contracting, the MC-4A Parallel Interceptor Rehabilitation Project – Joe Pool Lake Project consisted of installing approximately 75 foot by 45 foot shaft with a depth…

read more