Completed in 2003 by Southland Contracting, the MC-4A Parallel Interceptor Rehabilitation Project – Joe Pool Lake Project consisted of installing approximately 75 foot by 45 foot shaft with a depth of 55 foot, 420 linear feet of 54-inch gravity sewer line by other than open cut, and 170 linear feet of 66-inch by 0.875 wall steel casing for Hobas pipe.
Project Details
- Owner: Trinity River Authority
- Location: Grand Prairie, Texas, United States
- Performed as: Southland Contracting, Inc.
- Project value: $378,600.00
- Completion Date: January 2003