Tunnels

San Antonio River Outfall Pipeline
San Antonio River Outfall Pipeline 1000 750 Southland Holdings

XX Project Details Owner: San Antonio Water System Location: San Antonio, Texas, United States Performed as: Southland Contracting, Inc. Project value: $700,000.00

read more
Rosedale Street Improvements, Contract 2
Rosedale Street Improvements, Contract 2 1000 750 Southland Holdings

Completed in 2004 by Southland Contracting, the Rosedale Street Improvements, Contract 2 project consisted of approximately 80 linear feet of 48-inch by 0.5-inch wall steel casing pipe. Project Details Owner:…

read more
Northside II 48-inch Water Main, Phase 1, Part 2
Northside II 48-inch Water Main, Phase 1, Part 2 1000 750 Southland Holdings

Completed by Southland Contracting, the Northside II 48-inch Water Main, Phase 1, Part 2 Project consisted of installing approximately 3,480 linear feet of 72-inch casing tunnel for water transmission. Project…

read more
Lake Ralph Hall Pipeline
Lake Ralph Hall Pipeline 1000 750 Southland Holdings

Completed in 2025 by Southland Contracting, the Lake Ralph Hall Pipeline Project consisted of the subcontract scope of work including tunneling, trench safety, shaft installation, tunnel pits, installation of 66-inch…

read more
Bachman WTP Ozone Facility & Chemical Feed
Bachman WTP Ozone Facility & Chemical Feed 1000 750 Southland Holdings

Completed by Southland Contracting, the Bachman WTP Ozone Facility & Chemical Feed Project consisted of installing approximately 461 linear feet by bore/casing. Project Details Owner: City of Dallas Location: Dallas,…

read more
84″ Cedar Crest Tunnel
84″ Cedar Crest Tunnel 1000 750 Southland Holdings

Completed in 2025 by Southland Contracting, the 84″ Cedar Crest Tunnel Project construction and scope of work includes 350 linear feet of tunneling, 260 linear feet of 72-inch and 360…

read more
Jacking, Boring or Tunneling Pipe – Segment 1, Section 1
Jacking, Boring or Tunneling Pipe – Segment 1, Section 1 1000 750 Southland Holdings

Completed in 2004 by Southland Contracting, the Jacking, Boring, or Tunneling Pipe – Segment 1, Section 1 Project consisted of installing approximately 160 linear feet of 30-inch steel pipe, 80…

read more
Mill Creek/Peaks Branch/State Thomas Drainage Relief Tunnel
Mill Creek/Peaks Branch/State Thomas Drainage Relief Tunnel 1000 750 Southland Holdings

Completed in 2026 by Southland Contracting, the Mill Creek/Peaks Branch/State Thomas Drainage Relief Tunnel Project construction and scope of work includes tunneling, 17,050 linear feet of 30-inch diameter concrete lined…

read more
Treated Water Transmission Main, Section 5
Treated Water Transmission Main, Section 5 1000 750 Southland Holdings

Completed in 2003 by Southland Contracting, the Treated Water Transmission Main, Section 5 Project consisted of approximately 308 linear feet of 60-inch casing pipe by jack and bore methods and…

read more
Lewisville Bore
Lewisville Bore 1000 750 Southland Holdings

Completed in 2002 by Southland Contracting, the Lewisville Bore Project consisted of approximately 240 linear feet of 42-inch casing pipe by bore method Project Details Owner: City of Lewisville Location:…

read more