Tunnels

Lewisville Bore
Lewisville Bore 1000 750 Southland Holdings

Completed in 2002 by Southland Contracting, the Lewisville Bore Project consisted of approximately 240 linear feet of 42-inch casing pipe by bore method Project Details Owner: City of Lewisville Location:…

read more
M207R G5, C3, P6, US DOE#2370
M207R G5, C3, P6, US DOE#2370 1000 750 Southland Holdings

Completed in 2000 by Southland Contracting, the M207R G5, C3, P6, US DOE#2370 Project consisted of installing approximately 1,247 linear feet of 12-inch sanitary sewer by Tunnel Boring Machine (TBM).…

read more
Dallas Water Meandering Way
Dallas Water Meandering Way 1000 750 Southland Holdings

Tunnel Boring Machine Project Details Owner: City of Dallas Location: Dallas, Texas, United States Performed as: Southland Contracting, Inc. Project value: xx Completion Date: April 2000

read more
Main C1C4B, G6, C2, P4, DOE#2719
Main C1C4B, G6, C2, P4, DOE#2719 1000 750 Southland Holdings

Completed in 2000 by Southland Contracting, the Main C1C4B, G6, C2, P4, DOE#2719 Project consisted of installing approximately 700 linear feet of 18-inch Class 51 Ductile Iron Pipe (DIP) by…

read more
TSU/SWB/MCI/TCI Coit Road @ IH635
TSU/SWB/MCI/TCI Coit Road @ IH635 1000 750 Southland Holdings

Completed in 2001 by Southland Contracting, the TSU/SWB/MCI/TCI Coit Road at IH635 Project consisted of installing approximately 610 linear feet of 72-inch bore by Tunnel Boring Machine (TBM). Project Details…

read more
IM20-4(240) I20 Tarrant County
IM20-4(240) I20 Tarrant County 1000 750 Southland Holdings

Completed in 2000 by Southland Contracting, the IM20-4(240) I20 Tarrant County Project consisted of installing approximately 648 linear feet of 24-inch reinforced concrete pipe (RCP) by Tunnel Boring Machine (TBM)…

read more
72″ Lake Chapman Water Supply Project
72″ Lake Chapman Water Supply Project 1000 750 Southland Holdings

Completed in 2001 by Southland Contracting, the 72″ Lake Chapman Water Supply Project consisted of installing approximately 4,600 total feet of 108-inch diameter tunnel, including a 1,040 crossing of Interstate…

read more
West Fork Relief Interceptor
West Fork Relief Interceptor 1000 750 Southland Holdings

Completed in 2000 by Southland Contracting, the West Fork Relief Interceptor Project consisted of installing approximately 147 linear feet of 119-inch clear inside diameter tunnel liner by the tunneling method…

read more
Boring LBJ with 30-inch Steel Casing
Boring LBJ with 30-inch Steel Casing 1000 750 Southland Holdings

Completed in 2001 by Southland Contracting, the Boring LBJ with 30-inch Steel Casing Project consisted of installing approximately 323 linear feet of 30-inch steel casing by bore at LBJ Freeway…

read more
University & 7th, Camp Bowie, Lancaster Bailey Water and Sewer
University & 7th, Camp Bowie, Lancaster Bailey Water and Sewer 1000 750 Southland Holdings

Completed in 2000 by Southland Contracting, the University & 7th, Camp Bowie, Lancaster Bailey Water and Sewer Project consisted of approximately 391 linear feet of 12-inch ductile iron pipe (DIP)…

read more