Paisano Vally 48-inch Water Transmission Line
Paisano Vally 48-inch Water Transmission Line 1000 750 Southland Holdings

Completed in 2013 by Southland Contracting, the Paisano Vally 48-inch Water Transmission Line Project consisted of the installation of approximately 16,880 linear feet of owner furnished 48-inch steel water main…

read more
S. I35 Segment 2/5 – I35 Slaughter and Onion Creek Crossing, 36-inch Water Main
S. I35 Segment 2/5 – I35 Slaughter and Onion Creek Crossing, 36-inch Water Main 1000 750 Southland Holdings

Completed in 2012 by Southland Contracting, the S. I35 Segment 2/5 – I35 Slaughter and Onion Creek Crossing, 36-inch Water Main Project consisted of the installation of approximately 5,210 linear…

read more
Water and Wastewater Main Replacement in Mid-East White Rock Drainage Area (Ferris Branch Phase 2)
Water and Wastewater Main Replacement in Mid-East White Rock Drainage Area (Ferris Branch Phase 2) 1000 750 Southland Holdings

Completed in 2012 by Southland Contracting, the Water and Wastewater Main Replacement in Mid-East White Rock Drainage Area (Ferris Branch Phase 2) Project consisted of the installation of approximately 3,145…

read more
Corbalis to Fox Mill 54-inch Water Main
Corbalis to Fox Mill 54-inch Water Main 688 516 Southland Holdings

Completed in 2012 by Southland Contracting, the Corbalis to Fox Mill 54-inch Water Main Project consisted of the furnishing and installing approximately 12,000 linear feet of 54-inch watermain along with…

read more
Northwest Drainage Improvements Project
Northwest Drainage Improvements Project 1000 750 Southland Holdings

Completed in 2013 by Southland Contracting, the Northwest Drainage Improvements Project consisted of the construction of a drainage system to provide relief from Maxey Park Lake (Lake 43) in central…

read more
S. I35 Onion Creek Wastewater Interceptor – Rinard to Slaughter
S. I35 Onion Creek Wastewater Interceptor – Rinard to Slaughter 1000 750 Southland Holdings

Completed in 2013 by Southland Contracting, the S. I35 Onion Creek Wastewater Interceptor – Rinard to Slaughter Project consisted of the installation of approximately 5,024 linear feet of tunnel for…

read more
Eastside Water Supply Project Raw Water Intake Tunnel
Eastside Water Supply Project Raw Water Intake Tunnel 1000 750 Southland Holdings

Completed in 2013 by Southland Contracting, the Eastside Water Supply Project Raw Water Intake Tunnel Project consisted of the construction of one 45-ft-diameter shaft 170 ft deep; 6,000 lf of…

read more
Magnolia Stormwater Forcemain Phase 1
Magnolia Stormwater Forcemain Phase 1 1000 750 Southland Holdings

Completed in 2014 by Southland Contracting, the Magnolia Stormwater Forcemain Phase 1 Project consisted of the excavation of approximately 4,500 linear feet of 60-inch diameter force main in sandy soils.…

read more
South Lubbock Sanitary Sewer Extension
South Lubbock Sanitary Sewer Extension 1000 750 Southland Holdings

Completed in 2014 by Southland Contracting, the South Lubbock Sanitary Sewer Extension Project consisted of the excavation/supporting approximately 2,390 linear feet of tunnel, including installing carrier pipe and placing LDCC…

read more
Lake Mead Intake Tunnel No. 3
Lake Mead Intake Tunnel No. 3 1000 750 Southland Holdings

Completed in 2014 by Southland Contracting, the Lake Mead Intake Tunnel No. 3 Project consisted of the construction of a deep-water intake, a pumping station, and a large-diameter water supply…