Tunnels

Jacking, Boring or Tunneling Pipe – Segment 1, Section 1
Jacking, Boring or Tunneling Pipe – Segment 1, Section 1 1000 750 Southland Holdings

Completed in 2004 by Southland Contracting, the Jacking, Boring, or Tunneling Pipe – Segment 1, Section 1 Project consisted of installing approximately 160 linear feet of 30-inch steel pipe, 80…

read more
Mill Creek/Peaks Branch/State Thomas Drainage Relief Tunnel
Mill Creek/Peaks Branch/State Thomas Drainage Relief Tunnel 1000 750 Southland Holdings

Completed in 2026 by Southland Contracting, the Mill Creek/Peaks Branch/State Thomas Drainage Relief Tunnel Project construction and scope of work includes tunneling, 17,050 linear feet of 30-inch diameter concrete lined…

read more
Treated Water Transmission Main, Section 5
Treated Water Transmission Main, Section 5 1000 750 Southland Holdings

Completed in 2003 by Southland Contracting, the Treated Water Transmission Main, Section 5 Project consisted of approximately 308 linear feet of 60-inch casing pipe by jack and bore methods and…

read more
Lewisville Bore
Lewisville Bore 1000 750 Southland Holdings

Completed in 2002 by Southland Contracting, the Lewisville Bore Project consisted of approximately 240 linear feet of 42-inch casing pipe by bore method Project Details Owner: City of Lewisville Location:…

read more
36 SR, P.11, G.5.C2, U2 Hemphill
36 SR, P.11, G.5.C2, U2 Hemphill 1000 750 Southland Holdings

Completed by Southland Contracting, the 36 SR, P.11, G.5.C2, U2 Hemphill Project consisted of approximately 340 linear feet of 16-inch Ductile Iron Pipe (DIP) by Tunnel Boring Machine and approximately…

read more
LCRA Brosely Creek
LCRA Brosely Creek 1000 750 Southland Holdings

Completed by Southland Contracting, the LCRA Brosley Creek Project consisted of approximately 350 linear feet. Project Details Owner: City of Austin Location: Austin, Texas, United States Performed as: Southland Contracting,…

read more
Coit Road IH 635 & IH75
Coit Road IH 635 & IH75 1000 750 Southland Holdings

Completed in 2003 by Southland Contracting, the Coit Road IH 635 & IH 75 Project consisted of approximately 900 linear feet of 36-inch tunnel by Tunnel Boring Machine. Project Details…

read more
DFW Deicing Phase II
DFW Deicing Phase II 1000 750 Southland Holdings

800 linear feet Project Details Owner: DFW Airport Location: DFW Airport, Texas, United States Performed as: Southland Contracting, Inc. Project value: xx

read more
207R Unit 1 Alt B
207R Unit 1 Alt B 1000 750 Southland Holdings

Completed by Southland Contracting, the 207R Unit 1 Alt B Project consisted of approximately 1,770 linear feet of 30-inch tunnel, 4,265 linear feet of 24-inch tunnel, 200 linear feet of…

read more
George Bush Freeway – Hwy 78 & Rena Road
George Bush Freeway – Hwy 78 & Rena Road 1000 750 Southland Holdings

Completed in 2001 by Southland Contracting, the George Bush Freeway – Hwy 78 & Rena Road Project consisted of approximately 1,100 linear feet of 12-inch casing pipe by other than…

read more