2013 Bond Fund Water & Sewer Replacement Package #4
2013 Bond Fund Water & Sewer Replacement Package #4 1000 750 Southland Holdings

Completed in 2021 by Oscar Renda Contracting, the 2013 Bond Fund Water & Sewer Replacement Package #4 Project consisted of the installation of approximately 42,000 linear feet of water distribution…

read more
The Biloxi North Contract Areas 11, 12, 13, & 14
The Biloxi North Contract Areas 11, 12, 13, & 14 1000 750 Southland Holdings

Completed in 2021 by Oscar Renda Contracting, the Biloxi North Contract Areas 11, 12, 13, & 14 Project consisted of the removal and replacement of approximately 595,477 linear feet of…

read more
E-19 Seguin Road to Nacogdoches Road
E-19 Seguin Road to Nacogdoches Road 1000 750 Southland Holdings

Completed in 2020 by Oscar Renda Contracting, the E-19 Seguin Road to Nacogdoches Road Project consisted of the replacement and upsizing of 3.1 miles (16,368 linear feet) of 48-inch gravity…

read more
Phase V West Ashley Sewer Tunnel and Influent Pump Station
Phase V West Ashley Sewer Tunnel and Influent Pump Station 1000 750 Southland Holdings

Completed in 2020 by Oscar Renda Contracting, the Phase V West Ashley Sewer Tunnel and Influent Pump Station Project involved constructing a 60 MGD capacity influent pump station with a…

read more
Navajo Gallup Water Supply Project, San Juan Lateral Block 9-11
Navajo Gallup Water Supply Project, San Juan Lateral Block 9-11 1000 750 Southland Holdings

Completed in 2020 by Oscar Renda Contracting, the Navajo Gallup Water Supply Project, San Juan Lateral Block 9-11 Project consisted of 28 miles of 48 and 42-inch diameter water transmission…

read more
C-13 Broadway Corridor, Package B
C-13 Broadway Corridor, Package B 1000 750 Southland Holdings

Completed in 2019 by Oscar Renda Contracting, the C-13 Broadway Corridor, Package B Project consisted of open cut sewer main installation that consisted of 350 linear feet of 24-inch, 3,700…

read more
Elm Fork Relief Interceptor EF-R1/EF-R2
Elm Fork Relief Interceptor EF-R1/EF-R2 1000 750 Southland Holdings

Completed in 2023 by Oscar Renda Contracting, the Elm Fork Relief Interceptor EF-R1/EF-R2 Project consisted of approximately 11,800 linear feet of 72-inch sewer line, 330 linear feet of 72-inch FRP,…

read more
Integrated Pipeline (IPL) Section 17 Trinity River Tunnel Crossing
Integrated Pipeline (IPL) Section 17 Trinity River Tunnel Crossing 1000 750 Southland Holdings

Completed in 2022 by Oscar Renda Contracting, the Integrated Pipeline (IPL) Section 17 Trinity River Tunnel Crossing Project consisted of approximately 11,800 linear feet of 108-inch water line. Scope of…

read more
Crabtree Basin Wastewater System Conveyance Improvements, Phase 2
Crabtree Basin Wastewater System Conveyance Improvements, Phase 2 1000 750 Southland Holdings

Completed in 2022 by Oscar Renda Contracting, the Crabtree Basin Wastewater System Conveyance Improvements, Phase 2 Project consisted of the installation of 25,000 linear feet of 36-inch and 54-inch gravity…

read more
Finished Water Two Pipeline & Cannon Lateral
Finished Water Two Pipeline & Cannon Lateral 1000 750 Southland Holdings

Completed in 2021 by Oscar Renda Contracting, the Finished Water Two Pipeline & Cannon Lateral Project consisted of the installation of approximately 44,128 linear feet of 33-inch steel welded pipe…