Tunnels

Briar Creek Relief Sewer Tunnel Phase 2
Briar Creek Relief Sewer Tunnel Phase 2 1000 750 Southland Holdings

Completed in 2014 by Southland Contracting, the Briar Creek Relief Sewer Phase II Project consisted of the construction of approximately 3.5 miles of finished internal diameter between 8.5 feet and…

read more
East Bank – West Bank Sewer Interceptor
East Bank – West Bank Sewer Interceptor 1000 750 Southland Holdings

Completed in 2015 by Southland Contracting, the East-West Bank Sewer Interceptor Project consisted of the construction of approximately 3,350 linear feet of 118-inch outside diameter (OD) Tunnel Boring Machine (TBM)…

read more
Liberty University Vehicular Tunnel
Liberty University Vehicular Tunnel 1000 750 Southland Holdings

Completed in 2014 by Southland Contracting, the Liberty University Vehicular Tunnel Project consisted of the construction of a twin-tube box tunnel system to pass under the existing set of Norfolk…

read more
Bi-County Water Tunnel
Bi-County Water Tunnel 1000 750 Southland Holdings

Completed in 2015 by Southland Contracting, the Bi-County Water Tunnel Project consisted of the construction of a new 5.3-mile water pipeline to meet the future water requirements for Montgomery and…

read more
Gateway Stormwater Ponds Tunnel
Gateway Stormwater Ponds Tunnel 1000 750 Southland Holdings

Completed in 2015 by Southland Contracting, the Gateway Stormwater Ponds Tunnel Project consisted of the construction of approximately 580 linear feet of 96-inch diameter liner plate tunnel with 592 linear…

read more
New Irvington Tunnel
New Irvington Tunnel 1000 750 Southland Holdings

Completed in 2015 by Southland Contracting, the New Irvington Tunnel Project consisted of the construction of a 3.5 miles long, 16.5 foot diameter tunnel for water conveyance, replacing the existing…

read more
Jollyville Transmission Main
Jollyville Transmission Main 1000 750 Southland Holdings

Completed in 2015 by Southland Contracting, the Jollyville Water Transmission Main Project was necessary to transport water from Water Treatment Plant No. 4 to the Jollyville Reservoir where it will…

read more
48-inch Bachman Wastewater Interceptor
48-inch Bachman Wastewater Interceptor 1000 750 Southland Holdings

Completed in 2016 by Southland Contracting, the 48-Inch Bachman Lake Wastewater Interceptor Project is a noteworthy micro tunnel boring machine (MTBM) project situated in Dallas, Texas. This substantial undertaking spans…

read more
North Acres Wastewater Tunnel
North Acres Wastewater Tunnel 1000 750 Southland Holdings

Completed in 2016 by Southland Contracting, the North Acres Wastewater Tunnel Project consisted of furnishment and installation of approximately 120 linear feet of 15-inch and 24-inch wastewater pipeline by open-cut…

read more
Paradise Whitney Interceptor Phase 3
Paradise Whitney Interceptor Phase 3 1000 750 Southland Holdings

Completed in 2017 by Southland Contracting, the Paradise Whitney Interceptor Phase 3 Project consisted of installation of approximately 23,300 linear feet of 36-inch to 60-inch FRP sewer mainline and 15,420…

read more