Specialty Structures

Lake Texoma Outfall to Wylie WTP Raw Water Pipeline Project Package 4.01 and 4.02
Lake Texoma Outfall to Wylie WTP Raw Water Pipeline Project Package 4.01 and 4.02 1000 750 Southland Holdings

Completed in 2014 by Oscar Renda Contracting, the Lake Texoma Outfall to Wylie Water Treatment Plant (WTP) Raw Water Pipeline Project Packages 4.01 and 4.02 encompassed a wide range of…

read more
Bi-County Water Tunnel
Bi-County Water Tunnel 1000 750 Southland Holdings

Completed in 2014 by Oscar Renda Contracting, the Bi-County Water Tunnel project consisted of approximately 28,000 linear feet of 120-inch diameter deep rock tunnel through bedrock at depths ranging from…

read more
Shepherd Drive Drainage and Paving Improvements
Shepherd Drive Drainage and Paving Improvements 1000 750 Southland Holdings

Completed in 2016 by Oscar Renda Contracting, the Shepherd Drive Drainage and Paving Improvements Project consisted of the removal of existing monolithic and RCP storm sewers and the installation of…

read more
Integrated Pipeline Project (IPL) Section 15-1
Integrated Pipeline Project (IPL) Section 15-1 1000 750 Southland Holdings

Completed in 2015 by Oscar Renda Contracting, the Section 15-1 of the Integrated Pipeline Project consisted of approximately 25,479 linear feet of 108-inch water line by combination of open-cut and…

read more
Mainline Phase 1 Section 2 & Pembrook Mainline
Mainline Phase 1 Section 2 & Pembrook Mainline 1000 750 Southland Holdings

The Mainline Phase 1 Section 2 & Pembrook Mainline Project, completed in 2015 by Oscar Renda Contracting, was a significant infrastructure undertaking that included multiple complex installations for water conveyance…

read more
Regional Carrizo Program: Water Delivery Pipeline Project
Regional Carrizo Program: Water Delivery Pipeline Project 1000 750 Southland Holdings

The Regional Carrizo Program: Water Delivery Pipeline Project, completed in 2014 by Oscar Renda Contracting, involved the installation of multiple sizes of High-Density Polyethylene (HDPE) pipes, including 36-inch, 16-inch, and…

read more
DFW Facilities Relocation and Consolidation (Southwest Consolidation Campus Roads and Utilities Phase 1B)
DFW Facilities Relocation and Consolidation (Southwest Consolidation Campus Roads and Utilities Phase 1B) 1000 750 Southland Holdings

Completed in 2023 by Oscar Renda Contracting, the DFW Facilities Relocation and Consolidation (Southwest Consolidation Campus Roads and Utilities Phase 1B) Project consisted of the replacement and installation of sanitary…

read more
Memorial Drive Paving and Drainage Improvements
Memorial Drive Paving and Drainage Improvements 1000 750 Southland Holdings

Completed in 2021 by Oscar Renda Contracting, the Memorial Drive Paving and Drainage Improvements Project consisted of the reconstruction from North Kirkwood Drive to North Eldridge Parkway. Scope of work…

read more
Central Business District (CBD) I-20/59 Bridge Replacement
Central Business District (CBD) I-20/59 Bridge Replacement 1000 750 Southland Holdings

Completed in 2021 by Oscar Renda Contracting, the Central Business District (CBD) I-20/59 Bridge Replacement Project consisted of the bridge replacement on I-20/59 from the I-65 Interchange to North of…

read more
2013 Bond Fund Water & Sewer Replacement Package #4
2013 Bond Fund Water & Sewer Replacement Package #4 1000 750 Southland Holdings

Completed in 2021 by Oscar Renda Contracting, the 2013 Bond Fund Water & Sewer Replacement Package #4 Project consisted of the installation of approximately 42,000 linear feet of water distribution…

read more