Crabtree Basin Wastewater System Conveyance Improvements, Phase 2
Crabtree Basin Wastewater System Conveyance Improvements, Phase 2 https://www.southlandholdings.com/wp-content/uploads/Southland_Holdings_Stacked.png 1000 750 Southland Holdings https://www.southlandholdings.com/wp-content/uploads/Southland_Holdings_Stacked.pngCompleted in 2022 by Oscar Renda Contracting, the Crabtree Basin Wastewater System Conveyance Improvements, Phase 2 Project consisted of the installation of 25,000 linear feet of 36-inch and 54-inch gravity…
read more



