Pipeline

South Interceptor Force Main Project – Section A and Section B
South Interceptor Force Main Project – Section A and Section B 1000 750 Southland Holdings

Completed in 2015 by Oscar Renda Contracting, the South Interceptor Force Main Project – Section A and Section B Project consisted of two sections. Section A consists of 20-inch, 36-inch,…

read more
Navajo Gallup Water Supply Project, San Juan Lateral Block 9-11
Navajo Gallup Water Supply Project, San Juan Lateral Block 9-11 1000 750 Southland Holdings

Completed in 2020 by Oscar Renda Contracting, the Navajo Gallup Water Supply Project, San Juan Lateral Block 9-11 Project consisted of 28 miles of 48 and 42-inch diameter water transmission…

read more
C-13 Broadway Corridor, Package B
C-13 Broadway Corridor, Package B 1000 750 Southland Holdings

Completed in 2019 by Oscar Renda Contracting, the C-13 Broadway Corridor, Package B Project consisted of open cut sewer main installation that consisted of 350 linear feet of 24-inch, 3,700…

read more
Elm Fork Relief Interceptor EF-R1/EF-R2
Elm Fork Relief Interceptor EF-R1/EF-R2 1000 750 Southland Holdings

Completed in 2023 by Oscar Renda Contracting, the Elm Fork Relief Interceptor EF-R1/EF-R2 Project consisted of approximately 11,800 linear feet of 72-inch sewer line, 330 linear feet of 72-inch FRP,…

read more
Integrated Pipeline (IPL) Section 17 Trinity River Tunnel Crossing
Integrated Pipeline (IPL) Section 17 Trinity River Tunnel Crossing 1000 750 Southland Holdings

Completed in 2022 by Oscar Renda Contracting, the Integrated Pipeline (IPL) Section 17 Trinity River Tunnel Crossing Project consisted of approximately 11,800 linear feet of 108-inch water line. Scope of…

read more
Crabtree Basin Wastewater System Conveyance Improvements, Phase 2
Crabtree Basin Wastewater System Conveyance Improvements, Phase 2 1000 750 Southland Holdings

Completed in 2022 by Oscar Renda Contracting, the Crabtree Basin Wastewater System Conveyance Improvements, Phase 2 Project consisted of the installation of 25,000 linear feet of 36-inch and 54-inch gravity…

read more
Finished Water Two Pipeline & Cannon Lateral
Finished Water Two Pipeline & Cannon Lateral 1000 750 Southland Holdings

Completed in 2021 by Oscar Renda Contracting, the Finished Water Two Pipeline & Cannon Lateral Project consisted of the installation of approximately 44,128 linear feet of 33-inch steel welded pipe…

read more
Big Fossil Parallel Relief M-402A, Phase 1 and Haltom City Meter Station & Sewer Outfall, Phase 3
Big Fossil Parallel Relief M-402A, Phase 1 and Haltom City Meter Station & Sewer Outfall, Phase 3 1000 750 Southland Holdings

Completed in 2021 by Oscar Renda Contracting, the Big Fossil Parallel Relief M-402A, Phase 1 and Haltom City Meter Station & Sewer Outfall, Phase 3 Project consisted of the installation…

read more
Elm Fork Interceptor EF-2B
Elm Fork Interceptor EF-2B 1000 750 Southland Holdings

Completed in 2021 by Oscar Renda Contracting, the Elm Fork Interceptor EF-2B Project consisted of approximately 6,900 linear feet of 42-inch to 48-inch sanitary sewer main which included 1,360 linear…

read more
Huebner Creek Enhanced Conveyance NWWC Segment 3
Huebner Creek Enhanced Conveyance NWWC Segment 3 1000 750 Southland Holdings

Completed in 2021 by Oscar Renda Contracting, the Huebner Creek Enhanced Conveyance NWWC Segment 3 Project consisted of channelization of Huebner Creek with scope of work that included protection, removal,…

read more