Marine

Crown Bay Pier Expansion and Mixed-Use Center
Crown Bay Pier Expansion and Mixed-Use Center 827 620 Southland Holdings

This design/build project involved the expansion and total reconstruction of the Crown Bay facility. Work included installation of 1,400LF of HZ 775C wall using AZ13 steel sheets, all tied back,…

read more
WPB Moorings – U.S. Coast Guard
WPB Moorings – U.S. Coast Guard 796 597 Southland Holdings

Completed in 2003 by American Bridge, the WPB Moorings project for the U.S. Coast Guard involved the construction of a 230LF concrete-capped sheet-pile bulkhead with utilities and fender system for…

read more
Harbor Village Marina
Harbor Village Marina 589 442 Southland Holdings

Completed in 2003 by American Bridge, the Harbor Village Marina project involved constructing a 76-acre marina and residential development along Florida’s Intracoastal Waterway. It included the installation of 14,000 LF…

read more
Pier 7 Naval Station
Pier 7 Naval Station 575 431 Southland Holdings

Completed in 2005 by American Bridge, the Pier 7 Naval Station project involved constructing a 456m by 28m double-deck berthing pier supported by 400 concrete cylinder piles. The lower deck…

read more
Port Manatee Berth 8 Bulkhead Replacement
Port Manatee Berth 8 Bulkhead Replacement 600 450 Southland Holdings

Completed in 2002 by American Bridge, the Port Manatee Berth 8 Bulkhead Replacement project involved removing the failed bulkhead and installing 331 LF of new Pipe/Z and sheet pile bulkhead…

read more
Graving Dock Bulkhead
Graving Dock Bulkhead 924 693 Southland Holdings

Completed in 2001 by American Bridge, the Graving Dock Bulkhead project involved removing and replacing a sheetpile bulkhead for a graving dock at Braddock, Pennsylvania, as part of a new…

read more
Winter Park Canal Wall Replacement
Winter Park Canal Wall Replacement 640 480 Southland Holdings

Completed in 2001 by American Bridge, the Winter Park Canal Wall Replacement project involved installing 4,600 linear feet of sheet pile walls to replace deteriorated wood walls in the Fern…

read more
Bahamas Cement Bulkhead Repair
Bahamas Cement Bulkhead Repair 1000 750 Southland Holdings

Completed in 2001 by American Bridge, the Bahamas Cement Bulkhead Repair project involved repairing an existing bulkhead wall, including demolition of 30′ of concrete cap, excavation and backfill, removal of…

read more
Wheeling Heritage Port
Wheeling Heritage Port 1000 750 Southland Holdings

Completed in 2000 by American Bridge, the Wheeling Heritage Port project involved removing a wooden dock and timber piling, then installing the substructure for a 380′ dock on the Ohio…

read more
Emsworth Dam Gate Replacement
Emsworth Dam Gate Replacement 1000 750 Southland Holdings

Completed in 2002 by American Bridge, the Emsworth Dam Gate Replacement project involved removing and replacing a vertical lift gate, including its operating equipment. The scope included installing a new…

read more