Marine

Poseidon Wharf Repairs
Poseidon Wharf Repairs 360 270 Southland Holdings

Completed in 1999 by American Bridge, the Poseidon Wharf Repairs project involved converting a Navy submarine dock into a general-purpose dock. Work included demolition, pile driving, structural steel and concrete…

read more
State Route 699 Gulf Boulevard Seawall
State Route 699 Gulf Boulevard Seawall 911 683 Southland Holdings

Completed in 2008 by American Bridge, the State Route 699 Gulf Boulevard Seawall project involved replacing 800 feet of seawall cap, 50 feet of seawall, a tieback system, earthworks, dock…

read more
Dames Point Container Terminal, Project One
Dames Point Container Terminal, Project One 773 580 Southland Holdings

Completed in 2008 by American Bridge, the Dames Point Container Terminal Project One involved constructing a 2,924 LF wharf, including an HZ combination wall with tiebacks, cathodic protection, reinforced concrete…

read more
Pier 2 Guard House
Pier 2 Guard House 1000 750 Southland Holdings

Completed in 2007 by American Bridge, the Pier 2 Guard House project at Norfolk Naval Station included marine concrete work, an interior distribution system, and interior lighting installation. Project Details…

read more
CG Railway, Railcar Ferry Terminal
CG Railway, Railcar Ferry Terminal 432 324 Southland Holdings

Completed in 2007 by American Bridge, the CG Railway Railcar Ferry Terminal project involved constructing a new railroad ferry slip with sheet pile walls, a concrete cap, soil anchors, a…

read more
Kissimmee River Restoration Project
Kissimmee River Restoration Project 910 682 Southland Holdings

Installed and removed 256’ of temporary trestle bridge and removed three weirs at approximately 360’ each. Project Details Owner: U.S. Army Corps of Engineers Location: Avon Park, Florida, United States…

read more
St. Petersburg Marina Rehabilitation
St. Petersburg Marina Rehabilitation 381 286 Southland Holdings

Completed in 2007, the St. Petersburg Marina Rehabilitation project involved structural repairs to an existing pier, including deck replacement, concrete spall and column encapsulation, and pile jackets. Utility upgrades included…

read more
Pier 4 Fender Pile Repairs
Pier 4 Fender Pile Repairs 764 573 Southland Holdings

Completed in 2006 by American Bridge, the Pier 4 Fender Pile Repairs included replacing and repairing damaged fender piles, timber chocks, and installing pile top treatments. Project Details Owner: Department…

read more
CMOF Foundation Package
CMOF Foundation Package 1000 750 Southland Holdings

Completed in 2006 by American Bridge, the CMOF Foundation Package project included piling, stone column foundations, concrete slabs, pile caps, platen slabs, and site utilities for the Covered Modular Outfitting…

read more
RCID Canal Side Slope Repair
RCID Canal Side Slope Repair 907 680 Southland Holdings

This project involved repair to the canal slopes damaged by the hurricanes of 2004. Project Details Owner: Reedy Creek Improvement District Location: Lake Buena Vista, Florida, United States Performed as:…

read more