FEATURED PROJECTS

I-59/20 Bridge Replacement
Birmingham, ALThe CBD Bridge Project is the Largest Project in ALDOT History.
View Details
Entergy Power Group Transmission Line
Longview, TexasThe Entergy Water Supply Project was a joint venture between KSA Engineering, Inc. (Longview, TX) and Oscar Renda Contracting, Inc. (Roanoke, TX). Bloc Design-Build, LLC, managed the project. The project...
View Details
Lake Jesup Causeway Bridge
Geneva, FloridaDistrict 5 of the Florida Department of Transportation hired Southland Holdings to design and build the SR 46 roadway and bridge replacement, to both replace the aging bridge and improve the...
View Details
Jupiter Bridges
Jupiter, FloridaDistrict 4 of the Florida Department of Transportation looked to us for design/build expertise for the replacement of four low-level bridges over the Lake Worth Oxbow and approaches along U.S. 1...
View Details
I-59/20 Bridge Replacement
Birmingham, ALThe CBD Bridge Project is the Largest Project in ALDOT History.
View Details
Entergy Power Group Transmission Line
Longview, TexasThe Entergy Water Supply Project was a joint venture between KSA Engineering, Inc. (Longview, TX) and Oscar Renda Contracting, Inc. (Roanoke, TX). Bloc Design-Build, LLC, managed the project. The project...
View Details
TECO Flume Reconstruction
Manatee County, FLWe were the choice for design/build services for the reconstruction of Tampa Electric Company’s facility for discharging non-contact water cooling for the heating coils at the power plant.
View Details
Lake Jesup Causeway Bridge
Geneva, FloridaDistrict 5 of the Florida Department of Transportation hired Southland Holdings to design and build the SR 46 roadway and bridge replacement, to both replace the aging bridge and improve the...
View Details
Jupiter Bridges
Jupiter, FloridaDistrict 4 of the Florida Department of Transportation looked to us for design/build expertise for the replacement of four low-level bridges over the Lake Worth Oxbow and approaches along U.S. 1...
View Details