Water Resources

California State Auto. Assn. Building
California State Auto. Assn. Building 1000 750 Southland Holdings

Completed in 1974 by American Bridge, the project involved fabricating and erecting a 29-story office building measuring 94′ x 149′ for the California State Auto Association. Project Details Owner: California…

read more
C.O.E. Penstocks
C.O.E. Penstocks 896 672 Southland Holdings

Completed in 1973 by American Bridge, the C.O.E. Penstocks project included designing, fabricating, and erecting a trestle, along with field fabrication and erection of the penstocks through it. Project Details…

read more
C.E.O. Tunnel Liner & Bifurcations – New Malones Dam
C.E.O. Tunnel Liner & Bifurcations – New Malones Dam 680 510 Southland Holdings

Completed in 1973 by American Bridge, the New Melones Dam project involved fabricating and erecting 2,567 L.F. of 23’-diameter tunnel liner (5,300 tons) with 1 1/8” plate thickness. It included…

read more
Brownlee Dam Penstocks
Brownlee Dam Penstocks 1000 750 Southland Holdings

Completed in 1977 by American Bridge, the Brownlee Dam Penstocks project included a penstock liner for Unit #5. Project Details Owner: Idaho Power Company Location: Cambridge, Idaho, United States Performed…

read more
Belridge Water transmission Pipelines
Belridge Water transmission Pipelines 1000 750 Southland Holdings

Completed in 1973 by American Bridge, the Belridge Water Transmission Pipelines project included pipelines 2A & 2B north of McKittrick on Highway 33. Project Details Owner: Belridge Water Storage District…

read more
Alamo Power Plant Penstock
Alamo Power Plant Penstock 1000 750 Southland Holdings

Completed in 1984 by American Bridge, the Alamo Power Plant Penstock project involved fabricating and erecting 400 LF each of 144″ and 123″ diameter penstock with bifurcation. Project Details Owner:…

read more
Afchafalaya Pipeline Bridge
Afchafalaya Pipeline Bridge 1000 750 Southland Holdings

Completed in 2016 by American Bridge, the Atchafalaya Pipeline Bridge project involved a 4,678′ bridge with a 2,000′ mainspan carrying two 30″ high-pressure gas pipelines. The scope included reprofiling the…

read more