Tunnels

Lemon and Oak Grove Wood Box Tunnel
Lemon and Oak Grove Wood Box Tunnel 1000 750 Southland Holdings

Completed in 2002 by Southland Contracting, the Lemon and Oak Grove Wood Box Tunnel Project consisted of installing approximately 45 linear feet of 40-inch hand tunnel/wood box Tunnel. Project Details…

read more
1998 CIP Projects, Contract 25
1998 CIP Projects, Contract 25 1000 750 Southland Holdings

Completed in 2002 by Southland Contracting, the 1998 CIP Projects, Contract 25 Project consisted of installing approximately 111 linear feet of 14-inch casing by dry bore for sewer line and…

read more
Hackberry Regent Phase 1, 20″ Water Main
Hackberry Regent Phase 1, 20″ Water Main 1000 750 Southland Holdings

Completed in 2003 by Southland Contracting, the Hackberry Regent Phase 1, 20” Water Main Project consisted of installing approximately 239 linear feet of 30-inch by 3/8-inch casing pipe by bore/jack…

read more
Bear Creek Interceptor Sewer System Rehab
Bear Creek Interceptor Sewer System Rehab 1000 750 Southland Holdings

Completed in 2003 by Southland Contracting, the Bear Creek Interceptor Sewer System Rehab Project consisted of installing approximately 14,383 linear feet of 54-inch Hobas pipe by other than open cut…

read more
IH 635 and Hwy 75 Interchange
IH 635 and Hwy 75 Interchange 1000 750 Southland Holdings

Completed in 2003 by Southland Contracting, the IH 635 and Hwy 75 Interchange Project consisted of installing approximately 1,360 linear feet of 72-inch reinforce concrete pipe (RCP) by jack and…

read more
Harriet Creek Ranch Phace 1 – Water, Sanitary Sewer & Storm Drainage
Harriet Creek Ranch Phace 1 – Water, Sanitary Sewer & Storm Drainage 1000 750 Southland Holdings

Completed in 2002 by Southland Contracting, the Harriett Creek Ranch Phase 1 – Water, Sanitary Sewer & Storm Drainage Project consisted of installing approximately 100 linear feet of 30-inch casing…

read more
Northside II 48″ Water Transmission Line, Phase 1
Northside II 48″ Water Transmission Line, Phase 1 1000 750 Southland Holdings

Completed in 2003 by Southland Contracting, the Northside II 48″ Water Transmission Line, Phase 1 Project consisted of installing approximately 110 linear feet for 48-inch concrete cylinder water pipe (CCWP)…

read more
Strom Drainage Pipe Repair
Strom Drainage Pipe Repair 1000 750 Southland Holdings

Completed in 2002 by Southland Contracting, the Storm Drainage Pipe Repair Project consisted of installing approximately 1,134 linear feet of 42-inch cast-in-place pipe (CIPP) rehabilitation and repair of 160 joint…

read more
Sanitary Sewer Replacement, Rosedale/Pioneer Parkway
Sanitary Sewer Replacement, Rosedale/Pioneer Parkway 1000 750 Southland Holdings

Completed in 2003 by Southland Contracting, the Sanitary Sewer Replacement, Rosedale/Pioneer Parkway Project consisted of installing approximately 230 linear feet of 30-inch Hobas pipe by boring methods. Project Details Owner:…

read more
xx
xx 1000 750 Southland Holdings

637 linear feet of 20-inch by Tunnel Boring Machine, 20 linear feet of 21-inch by Tunnel Boring Machine Project Details Owner: City of Fort Worth Location: Fort Worth, Texas, United…

read more