Tunnels

A. R. Davis, Phase 4
A. R. Davis, Phase 4 1000 750 Southland Holdings

Completed in 1986 by Mole Constructors, the A.R. Davis, Phase 4 project entailed approximately 3,484 linear feet of 117-inch tunnel, employing a 117-inch Lovat Tunnel Boring Machine. Excavation occurred through…

read more
Bluestone Contract BTRS-1
Bluestone Contract BTRS-1 1000 750 Southland Holdings

Completed in 1993 by Mole Constructors, the Bluestone Contract BTRS-1 project involved the construction of a tunnel stretching over approximately 16,200 linear feet to accommodate 60-inch concrete pipe. The excavation…

read more
Onion Creek Interceptor Tunnel, Section 4
Onion Creek Interceptor Tunnel, Section 4 1000 750 Southland Holdings

Completed in 1985 by Mole Constructors, the Onion Creek Interceptor Tunnel, Section 4 project involved 29,368 linear feet of 110-inch tunnel, employing a 110-inch Lovat Tunnel Boring Machine, a 117-inch…

read more
Hilltop Interceptor Contract H-1
Hilltop Interceptor Contract H-1 1000 750 Southland Holdings

Completed in 1993 by Mole Constructors, the Hilltop Interceptor Contract H-1 project entailed the construction of 18,000 linear feet of tunnel to accommodate both 60-inch and 66-inch concrete pipes. The…

read more
Merrill Creek Reservoir
Merrill Creek Reservoir 1000 750 Southland Holdings

Completed in 1985 by Mole Constructors, the Merrill Creek Reservoir project entailed constructing a 1,540 linear feet tunnel with an 11-foot diameter tunnel. It was conventionally excavated as a horseshoe-shaped…

read more
Wickliffe Utility Tunnel
Wickliffe Utility Tunnel 1000 750 Southland Holdings

Completed in 1995 by Mole Constructors, the Wickliffe Utility Tunnel project encompassed the construction of a tunnel spanning 152 linear feet, specifically designed to accommodate 120-inch jack pipe. Situated at…

read more
Heights Interceptor, Contract 6
Heights Interceptor, Contract 6 1000 750 Southland Holdings

Completed in 1995 by Mole Constructors, the Heights Interceptor, Contract 6 project entailed the construction of a tunnel spanning 8,834 linear feet to accommodate 72-inch reinforced concrete pipe. The tunnel…

read more
Bluestone Contract 2
Bluestone Contract 2 1000 750 Southland Holdings

Completed in 1995 by Mole Constructors, the Bluestone Contract 2 project involved the construction of a tunnel stretching of approximately 14,250 linear feet to accommodate 66-inch concrete pipe. Excavation was…

read more
Olmsted Falls Connector Sewer
Olmsted Falls Connector Sewer 1000 750 Southland Holdings

Completed in 1994 by Mole Constructors, the Olmsted Falls Connector Sewer project entailed the construction of a tunnel spanning 15,120 linear feet to accommodate 48-inch concrete pipe. Excavation was conducted…

read more
Gateway Stormwater Ponds Tunnel
Gateway Stormwater Ponds Tunnel 1000 750 Southland Holdings

Completed in 2015 by Mole Constructors, the Gateway Stormwater Ponds Tunnel project serves to alleviate stormwater flooding in the vicinity of Interstate Highway 10 (IH10) during and after heavy rain…

read more