Tunnels

Highway 41, Phase IV Tunnel
Highway 41, Phase IV Tunnel 1000 750 Southland Holdings

Completed in 2017 by Southland Contracting, the Highway 4, Phase IV Tunnel Project consisted of installation of approximately 3,400 linear feet of 84-inch liner plate tunnel with 42-inch ductile iron…

read more
Bellvue Transmission Pipeline North Segment – Phase 2
Bellvue Transmission Pipeline North Segment – Phase 2 1000 750 Southland Holdings

Completed in 2018 by Southland Contracting, the Bellevue Transmission Pipeline North Segment – Phase 2 Project consisted of installation of approximately 2,500 linear feet of 88-inch tunnel – supported with…

read more
Kaneohe-Kailua Sewer Tunnel Wastewater Conveyance & Treatment Facility
Kaneohe-Kailua Sewer Tunnel Wastewater Conveyance & Treatment Facility 1000 750 Southland Holdings

Completed in 2019 by Southland Contracting, the Kaneohe-Kailua Sewer Tunnel Wastewater Conveyance & Treatment Facility Project was delivered to convey wastewater from the Kaneohe Wastewater Pre-Treatment Facility to Kailua’s Regional…

read more
C-13 Broadway Corridor, Package B
C-13 Broadway Corridor, Package B 1000 750 Southland Holdings

Completed in 2019 by Southland Contracting, the C-13 Broadway Corridor, Package B Project consisted of the construction of 510 linear feet of 120-inch liner plate siphon tunnel lined with one…

read more
Deep Rock Tunnel Connector Pump Station
Deep Rock Tunnel Connector Pump Station 1000 750 Southland Holdings

Completed in 2019 by Southland Contracting, the Deep Rock Tunnel Connector Pump Station Project was an effort to improve the water quality for the residents of the City of Indianapolis,…

read more
Hanlan Feedermain and Mississauga City Centre Watermain (Contract 3)
Hanlan Feedermain and Mississauga City Centre Watermain (Contract 3) 1000 750 Southland Holdings

Completed in 2019 by Southland Contracting, the Hanlan Feedermain and Mississauga City Centre Watermain (Contract 3) Project consisted of the installation of 8-foot diameter pipes to carry water from the…

read more
Phase V West Ashley Sewer Tunnel and Influent Pump Station
Phase V West Ashley Sewer Tunnel and Influent Pump Station 1000 750 Southland Holdings

Completed in 2020 by Southland Contracting, the Phase V West Ashley Sewer Tunnel and Influent Pump Station Project consisted of the replacement of an existing sewer tunnel, the construction of…

read more
E-19 Sequin Road to Nacogdoches Road, Segment 1
E-19 Sequin Road to Nacogdoches Road, Segment 1 1000 750 Southland Holdings

Completed in 2020 by Southland Contracting, the E-19 Sequin Road to Nacogdoches Road, Segment 1 Project consisted of the replacement and upsizing of 3.1 miles of 48-inch gravity wastewater mains…

read more
Bois d’Arc East Fork Trinity River Tunnel – Segment E
Bois d’Arc East Fork Trinity River Tunnel – Segment E 1000 750 Southland Holdings

Completed in 2023 by Southland Contracting, the Bois d’Arc East Fork Trinity River Tunnel – Segment E Project consisted of numerous individual components that must be orchestrated concurrently to collect,…

read more
Integrated Pipeline (IPL) Section 17 Trinity River Tunnel Crossing
Integrated Pipeline (IPL) Section 17 Trinity River Tunnel Crossing 1000 750 Southland Holdings

Completed in 2022 by Southland Contracting, the Integrated Pipeline (IPL) Section 17 Trinity River Tunnel Crossing Project consisted of the installation of approximately 11,700 linear feet of 108-inch steel water…

read more