Specialty Structures

Postal Facility
Postal Facility 1000 750 Southland Holdings

Completed in 1973 by American Bridge, the Postal City project consisted of fabricating and erecting a one-story postal facility measuring 367′ x 434′, with a roof varying from 15′ to…

read more
Pittsburgh Corporate Field Engineer Rotation
Pittsburgh Corporate Field Engineer Rotation 1000 750 Southland Holdings

None Project Details Owner: xx Location: Pennsylvania, United States Performed as: American Bridge Company Project value: $0.00 Completion Date: June 2009

read more
Pittsburgh National Bank
Pittsburgh National Bank 1000 750 Southland Holdings

Completed in 1970 by American Bridge, the Pittsburgh National Bank project consisted of fabricating and erecting a “T”-shaped, 30-story office building measuring 214 feet by 69 feet by 7 feet…

read more
Playground Bridge
Playground Bridge 1000 750 Southland Holdings

Completed in 1994 by American Bridge, the Playground Bridge project consisted of designing and erecting an unusual cable-stayed pedestrian bridge in the children’s area of the zoo. Project Details Owner:…

read more
Pocantico Hills
Pocantico Hills 1000 750 Southland Holdings

Completed in 1906 by American Bridge, the Pocantico Hills project consisted of fabricating and erecting the Pocantico Hills home of John D. Rockefeller, Sr. Project Details Owner: City of Pocantico…

read more
Philadelphia Convention Center (Original)
Philadelphia Convention Center (Original) 1000 750 Southland Holdings

Completed in 1966 by American Bridge, the Philadelphia Convention Center (Original) project consisted of a 300-by-420-foot exhibit hall featuring ten lines of 347-foot-long trusses with cantilevers at each end. Project…

read more
Perris Dam Tunnel Liner
Perris Dam Tunnel Liner 994 746 Southland Holdings

Completed in 1972 by American Bridge, the Perris Dam Tunnel Liner project consisted of fabricating and installing a tunnel liner approximately 12 feet in diameter and 1,600 feet long, placed…

read more
Peachtree Center One
Peachtree Center One 1000 750 Southland Holdings

Completed in 1965 by American Bridge, the Peachtree Center One project consisted of fabricating and erecting a 31-story irregularly shaped office building, one of four buildings erected by American Bridge…

read more
Peachtree Center Two
Peachtree Center Two 1000 750 Southland Holdings

Completed in 1965 by American Bridge, the Peachtree Center Two project consisted of fabricating and erecting a 22-story office building with three basement levels, measuring 240 feet by 65 feet…

read more
Pacific Insurance Company
Pacific Insurance Company 1000 750 Southland Holdings

Completed in 1971 by American Bridge, the Pacific Insurance Company project consisted of fabricating and erecting a 33-story office building with three basement levels and a penthouse. Project Details Owner:…

read more