Completed in 1972 by American Bridge, the Perris Dam Tunnel Liner project consisted of fabricating and installing a tunnel liner approximately 12 feet in diameter and 1,600 feet long, placed in a tunnel on a horizontal curve. The sections were shop fabricated, shipped by truck to the site, and erected by American Bridge at the rate of one section per day (five sections per week).This section was shop fabricated and shipped by truck to the site and was erected by ABD at the rate of one section per day (five sections per week).
Project Details
- Owner: xx
- Location: Riverside, California, United States
- Performed as: American Bridge Company
- Project value: $0.00
- Completion Date: October 1972