Specialty Structures

City of Paris Booster Pump Station
City of Paris Booster Pump Station 1000 750 Southland Holdings

Completed in 1995 by Oscar Renda Contracting, the City of Paris Booster Pump Station project consisted of the construction of a new treated water pump station at existing site/upgrade all…

read more
Southeast Sanitary Sewer System
Southeast Sanitary Sewer System 1000 750 Southland Holdings

Completed in 2004 by Oscar Renda Contracting, the Southeast Sanitary Sewer System project consisted of approximately 60,000 linear feet at depths up to 45 foot in hard limestone of triple…

read more
Central Wastewater Treatment Plant
Central Wastewater Treatment Plant 1000 750 Southland Holdings

Completed in 2004 by Oscar Renda Contracting, the Central Wastewater Treatment Plant project consisted of approximately 3,500 linear feet of 72-inch pre-stressed concrete cylinder pipe, and one effluent metering structure…

read more
Salado Creek WRC to Dos Rios WRC Interconnect
Salado Creek WRC to Dos Rios WRC Interconnect 1000 750 Southland Holdings

Completed in 2004 by Oscar Renda Contracting, the Salado Creek WRC to Dos Rios WRC Interconnect project consisted of approximately 18,000 linear feet of Hobas pipe, two 15-foot diameter tunnels…

read more
Wylie to Lavon Pipeline
Wylie to Lavon Pipeline 1000 750 Southland Holdings

Completed in 2004 by Oscar Renda Contracting, the Wylie to Lavon Pipeline project consisted of approximately 24,579 linear feet of 48-inch potable water transmission pipeline, connections to existing pipelines, air…

read more
West Frisco Wastewater Improvements
West Frisco Wastewater Improvements 1000 750 Southland Holdings

Completed in 2007 by Oscar Renda Contracting, the West Frisco Wastewater Improvements project consisted of modifications to three lift stations. Installation of 36-inch dual force main line from Gray Hawk…

read more
Precinct Line Road Improvements
Precinct Line Road Improvements 1000 750 Southland Holdings

Completed in 2007 by Oscar Renda Contracting, the Precinct Line Road Improvements project consisted of approximately 3,051 linear feet of 30-inch reinforced concrete cylinder pipe (RCCP), 374 linear feet of…

read more
Gregg Avenue Lift Station WL1 & WL-3
Gregg Avenue Lift Station WL1 & WL-3 1000 750 Southland Holdings

Completed in 2007 by Oscar Renda Contracting, the Gregg Avenue Lift Station WL1 & WL-3 project consisted of approximately 30,000 linear feet of 24-inch to 48-inch rehabilitation sewer. This project…

read more
Allen/Plano/Frisco/McKinney 72-inch Pipeline
Allen/Plano/Frisco/McKinney 72-inch Pipeline 1000 750 Southland Holdings

Completed in 2006 by Oscar Renda Contracting, the Allen/Plano/Frisco/McKinney 72-inch Pipeline project consisted of approximately 25,900 linear feet of 72-inch water transmission pipeline, connections to existing pipelines, air valve assemblies,…

read more
Holly 54-inch Water Line Northside Drive to White Settlement Road
Holly 54-inch Water Line Northside Drive to White Settlement Road 1000 750 Southland Holdings

Completed in 2006 by Oscar Renda Contracting, the Holly 54-inch Water Line Northside Drive to White Settlement Road Pipeline project consisted of approximately 4,900 linear feet of 54-inch Steel Pipe,…

read more