Specialty Structures

Large Valve Replacement
Large Valve Replacement 1000 750 Southland Holdings

This project included the removal and replacement of existing broken valves ranging size from 20-inch to 48-inch. All of this work took place in the street working around heavy traffic,…

read more
Rehab of Camino/McCamey Manholes
Rehab of Camino/McCamey Manholes 1000 750 Southland Holdings

This project included the complete replacement of 3 existing and far outdated brick manholes. All of them had structurally failed and one of them collapsed right before we started. Large…

read more
Golden Ear Pipe Installation
Golden Ear Pipe Installation 1000 750 Southland Holdings

ORCC performed steel pipe installation as a subcontractor to the prime on this project. Specialized crews were required to assist with the 900 mm diameter steel pipe installed through an…

read more
Red River Valley Water Supply: Transmission Pipeline East
Red River Valley Water Supply: Transmission Pipeline East 1000 750 Southland Holdings

Completed in 2026 by Oscar Renda Contracting, the Red River Valley Water Supply: Transmission Pipeline East project consisted of installing steel water pipeline, trenchless creek/river crossing and trenchless gas line…

read more
Elm Fork WTP Filter Complex, Phase 1
Elm Fork WTP Filter Complex, Phase 1 1000 750 Southland Holdings

Completed in 2027 by Oscar Renda Contracting, the Elm Fork WTP Filter Complex, Phase 1 project consisted of new filter complex and miscellaneous site work improvements. Scope of work includes…

read more
Rehabilitation of Connors Creek Sewer System
Rehabilitation of Connors Creek Sewer System 1000 750 Southland Holdings

Completed in 2025 by Oscar Renda Contracting, the Rehabilitation of Connors Creek Sewer System project consisted of rehabilitating existing sewers from 8-mile road at project end to Connors Creek Pump…

read more
North End Sewage Treatment Plant (NEWPCC) Upgrade: Headworks Facilities
North End Sewage Treatment Plant (NEWPCC) Upgrade: Headworks Facilities 1000 750 Southland Holdings

Completed in 2026 by Oscar Renda Contracting, the North End Sewage Treatment Plant (NEWPCC) Upgrade: Headworks Facilities project consisted of new headworks facility that entails construction of raw sewer pump…

read more
Granville Bridge Interim Connector
Granville Bridge Interim Connector 1000 750 Southland Holdings

Completed in 2024 by Oscar Renda Contracting, the Granville Bridge Interim Connector project consisted of reconstructing 120-year-old bridge infrastructure that entails removal of Northern loops and reconfiguring bridge deck to…

read more
Druid Lake Finished Reservoir Water Tanks
Druid Lake Finished Reservoir Water Tanks 1000 750 Southland Holdings

Completed in 2024 by Oscar Renda Contracting, the Druid Lake Finished Water Tanks project consisted of water tank construction and miscellaneous site restoration and development. Scope of work includes constructing…

read more
Coffee Creek Water Resource Recovery Facility (WRRF) Expansion
Coffee Creek Water Resource Recovery Facility (WRRF) Expansion 1000 750 Southland Holdings

Completed in 2024 by Oscar Renda Contracting, the Coffee Creek Water Resource Recovery Facility (WRRF) Expansion project consisted of new structures, yard piping, and site improvements of a water resource…

read more