Pipeline

Gillette Madison Pipeline
Gillette Madison Pipeline 1000 750 Southland Holdings

Completed in 2018 by Oscar Renda Contracting, the Gillette Madison Pipeline project consisted of approximately 115,850 linear feet of 42-inch waterline; 8,735 linear feet of 12-inch potable waterline; and 3,518…

read more
Montrose Main No. 2 Construction
Montrose Main No. 2 Construction 1000 750 Southland Holdings

Project and scope of work consists of installing 722 LF of 36-inch steel pipe by open cut means. Project Details Owner: Greater Vancouver Water District Location: Vancouver, British Columbia, Canada…

read more
Shiprock Wastewater Treatment Plant
Shiprock Wastewater Treatment Plant 1000 750 Southland Holdings

Project consists of constructing a new wastewater treatment plant to include: headworks, influent pump station, extended aeration system, blower building, sludge dewatering, administation building, crew building renovation, non-potable water station,…

read more
McKinney Delivery Point Pipeline No. 3 and No. 4
McKinney Delivery Point Pipeline No. 3 and No. 4 1000 750 Southland Holdings

Project and scope of work consist of installing approximately 33,000 LF of 72-inch diameter water transmission main to include all fittings, valves and appurtenances. Additional work includes 6,800 LF of…

read more
Navajo Gallup Water Supply Project Block 4C-8
Navajo Gallup Water Supply Project Block 4C-8 1000 750 Southland Holdings

Project and scope of work included earthwork, installing 29 miles of 42-inch to 48-inch water transmission pipeline including air valves and blowoffs, wash crossings, and jack and bore crossings. Project…

read more
New Westminster Interceptor – Columbia Section Rehabilitation by Sliplining
New Westminster Interceptor – Columbia Section Rehabilitation by Sliplining 1000 750 Southland Holdings

Project and scope of work included rehabilitation of approximately 1,600m of reinforced concrete sewer sliplining and associated infrastructure along Columbia Street. Project Details Owner: Metro Vancouver Location: Vancouver, British Columbia,…

read more
Arcadia Lake Water Treatment Plant (ALWTP) Intake and Low Level Pump Station
Arcadia Lake Water Treatment Plant (ALWTP) Intake and Low Level Pump Station 1000 750 Southland Holdings

Completed in 2025 by Oscar Renda Contracting, the Arcadia Lake Water Treatment Plant (ALWTP) Intake and Low Level Pump Station project consisted of a new Arcadia Lake Intake and Pump…

read more
Granville Bridge Interim Connector
Granville Bridge Interim Connector 1000 750 Southland Holdings

Completed in 2024 by Oscar Renda Contracting, the Granville Bridge Interim Connector project consisted of reconstructing 120-year-old bridge infrastructure that entails removal of Northern loops and reconfiguring bridge deck to…

read more
Rehabilitation of Connors Creek Sewer System
Rehabilitation of Connors Creek Sewer System 1000 750 Southland Holdings

Completed in 2025 by Oscar Renda Contracting, the Rehabilitation of Connors Creek Sewer System project consisted of rehabilitating existing sewers from 8-mile road at project end to Connors Creek Pump…

read more
Druid Lake Finished Reservoir Water Tanks
Druid Lake Finished Reservoir Water Tanks 1000 750 Southland Holdings

Completed in 2024 by Oscar Renda Contracting, the Druid Lake Finished Water Tanks project consisted of water tank construction and miscellaneous site restoration and development. Scope of work includes constructing…

read more