Marine

Berth 1 Bulkhead Replacement
Berth 1 Bulkhead Replacement 1000 749 Southland Holdings

This project entailed the removal and demolition of the existing bulkhead cap, fenders, bollards, foundations, utilities, and prop wash wall. In their place, a new sheet pile bulkhead wall was…

read more
Fort Desoto Gulf and Bay Piers Repairs
Fort Desoto Gulf and Bay Piers Repairs 1000 750 Southland Holdings

Completed in 2002 by Johnson Bros. Corporation, the Fort Desoto Gulf and Bay Piers Repairs project consisted of the demolition and replacement of the fishing pier at Fort Desoto County…

read more
Chalmette Port Rehabilitation
Chalmette Port Rehabilitation 1000 750 Southland Holdings

Completed in 2003 by Johnson Bros. Corporation, Chalmette Port Rehabilitation project included the removal and replacement of approximately 1,400 linear feet of warehouse and dock in phases at the Chalmette…

read more
Cargill Fertilizer – SFMD-5 Clay Settling Dam Site Development
Cargill Fertilizer – SFMD-5 Clay Settling Dam Site Development 1000 750 Southland Holdings

Completed in 2005, the Cargill Fertilizer – SFMD-5 Clay Settling Dam Site Development project consisted of the construction of approximately 900 Acres of clay settling dam. The project included demucking;…

read more
Lake Manatee Dam Tainter Gates
Lake Manatee Dam Tainter Gates 1000 749 Southland Holdings

Completed in 2011, the Lake Manatee Dam tainter Gates Project consisted of the repair of tainter gates at dam after driving sheet pile cofferdam and dewater the work areas; Install…

read more
COE West Return Levee Walls 3.2b
COE West Return Levee Walls 3.2b 259 194 Southland Holdings

Completed in 2012, the COE West Return Levee Walls Project is considered Best Value Construction of 3.2 miles of Post Katrina T Walls and demolition of existing T-Wall. Landscaping of…

read more
Emergency Work A1A
Emergency Work A1A 1000 750 Southland Holdings

Completed in 2013, the Emergency Work A1A consisted of the construction of approximately 2,400 linear feet of new sheet pile seawall, coping caps, sidewalk, beach area and repair damaged section…

read more
Port Improvements, Northern Expansion Phase II, Slip C, Part A, Bulkhead
Port Improvements, Northern Expansion Phase II, Slip C, Part A, Bulkhead 1000 750 Southland Holdings

Completed in 2015, the Port Improvements, Northern Expansion Phase II, Slip C, Part A, Bulkhead project consisted of the excavation/embankment of approximately 48,000 Cubic yards of site materials, installation of…

read more
Kentucky Lock Addition Downstream Cofferdam
Kentucky Lock Addition Downstream Cofferdam 750 1000 Southland Holdings

This project on the Tennessee River consisted of the construction of a cofferdam downstream of the Kentucky Dam to facilitate the addition of a new 1,200-foot lock landward of an…

read more
Pier 11 Safety Study
Pier 11 Safety Study 1000 750 Southland Holdings

Completed in 2004 by American Bridge, the Pier 11 Safety Study project consisted of performing consulting services to study, analyze, and prepare recommendations for safety improvements on Piers 11, 2,…

read more