Bridges & Transportation

George P. Coleman Bridge
George P. Coleman Bridge 812 609 Southland Holdings

Completed in 1952 by American Bridge, the George P. Coleman Bridge project consisted of fabricating and erecting twin 500′ swing spans as part of a 2,540′ crossing, making it one…

read more
Gary Refuse Conveyor Bridge
Gary Refuse Conveyor Bridge 647 485 Southland Holdings

Completed in 1982 by American Bridge, the Gary Refuse Conveyor Bridge project consisted of main cable and suspender rope replacement on a 1,117-foot suspension bridge carrying a mine refuse conveyor.…

read more
Galbraith Bridge
Galbraith Bridge 901 676 Southland Holdings

Completed in 1940 by American Bridge, the Galbraith Bridge project consisted of a thirteen-span bridge over the Mississippi River between Rock Island, Illinois, and Davenport, Iowa. The structure includes five…

read more
Fremont Bridge
Fremont Bridge 1000 750 Southland Holdings

Completed in 1970 by American Bridge, the Fremont Bridge features Oregon’s longest main span and is the world’s second longest tied arch bridge. American Bridge fabricated the piers and superstructure,…

read more
Forth Replacement Crossing – Manufacturing Plant, China
Forth Replacement Crossing – Manufacturing Plant, China 1000 750 Southland Holdings

Project Details Owner: Transport Scotland Location: China, China Performed as: American Bridge Company Project value: $0.00 Completion Date: June 2017

read more
Fourth Road Bridge Expansion Joint Replacement
Fourth Road Bridge Expansion Joint Replacement 1000 750 Southland Holdings

Replacement of main deck roller shutter expansion joints, comb joints, nosing joints and cycle track sliding plate joints. SOW: Survey existing, produce shop drawings, manufacture, remove existing and replace with…

read more
Fort Pitt Bridge
Fort Pitt Bridge 761 571 Southland Holdings

Completed in 1958 by American Bridge, the Fort Pitt Bridge project consisted of a 1,210-foot-long structure with a 750-foot main arch span and a width of 62 feet. The tie…

read more
Fort Bassinger Bridge
Fort Bassinger Bridge 1000 750 Southland Holdings

Completed in 1963 by American Bridge, the Fort Bassinger Bridge project consisted of a DPG swing span that was hand operated. Project Details Owner: CSX (CSXT) (Chessie and Seaboard X…

read more
Fort Duquesne Bridge
Fort Duquesne Bridge 1000 750 Southland Holdings

Completed in 1960 by American Bridge, the Fort Duquesne Bridge project consisted of a 639-foot-long bridge with a 423-foot main arch span and a width of 62 feet. The 65-foot…

read more
First Tampa Bay Bridge
First Tampa Bay Bridge 1000 750 Southland Holdings

Completed in 1954 by American Bridge, the First Tampa Bay Bridge project consisted of the erection of a cantilevered truss bridge. Project Details Owner: Florida Department of Transportation Location: Tampa…

read more