Tunnels

Integrated Pipeline Project (IPL) Section 15-1
Integrated Pipeline Project (IPL) Section 15-1 1000 750 Southland Holdings

Completed in 2015 by Oscar Renda Contracting, the Section 15-1 of the Integrated Pipeline Project consisted of approximately 25,479 linear feet of 108-inch water line by combination of open-cut and…

read more
WRA New Main Outfall, Phase 17, Segment 7
WRA New Main Outfall, Phase 17, Segment 7 1000 750 Southland Holdings

Completed in 2014 by Oscar Renda Contracting, the WRA New Main Outfall, Phase 17, Segment 7 project consisted of expanding and reinforcing critical sanitary sewer and water conveyance systems. This…

read more
Deep Rock Tunnel Connector
Deep Rock Tunnel Connector 1000 750 Southland Holdings

Completed in 2019 by Oscar Renda Contracting, the Deep Rock Tunnel Connector Project consisted of a screening and grit removal system consisting of 180-feet of 6-foot diameter connector tunnel, a…

read more
Paradise Whitney Interceptor Package 3
Paradise Whitney Interceptor Package 3 1000 750 Southland Holdings

Completed in 2018 by Oscar Renda Contracting, the Paradise Whitney Interceptor Package 3 Project consisted of approximately 23,000 linear feet of 36-inch to 60-inch sewer main line and 15,420 linear…

read more
Northside Sewer Relief Tunnel Rehabilitation Area No. 4
Northside Sewer Relief Tunnel Rehabilitation Area No. 4 1000 750 Southland Holdings

Completed in 2016 by Oscar Renda Contracting, the Northside Sewer Relief Tunnel Rehabilitation Area No. 4 Project consisted of trenchless sewer rehabilitation of approximately 4,689 linear feet of existing 132-inch…

read more
Shepherd Drive Drainage and Paving Improvements
Shepherd Drive Drainage and Paving Improvements 1000 750 Southland Holdings

Completed in 2016 by Oscar Renda Contracting, the Shepherd Drive Drainage and Paving Improvements Project consisted of the removal of existing monolithic and RCP storm sewers and the installation of…

read more
Mary Rhodes Pipeline, Phase 2 – Pump Stations and Sedimentation Basin
Mary Rhodes Pipeline, Phase 2 – Pump Stations and Sedimentation Basin 1000 750 Southland Holdings

Completed in 2016 by Oscar Renda Contracting, the Mary Rhodes Pipeline Phase 2 Pump Station/Sedimentation Basin Project consisted of two earthen sedimentation basins with capacities of approximately 12 million gallons…

read more
Mary Rhodes Pipeline Phase 2 Pipeline Section A
Mary Rhodes Pipeline Phase 2 Pipeline Section A 1000 750 Southland Holdings

Completed in 2016 by Oscar Renda Contracting, the Mary Rhodes Pipeline Phase 2 Pipeline Section A Project consisted of approximately 73,000 linear feet of 54-inch pipeline, including 1900 linear feet…

read more
Northside Sewer Relief Tunnel Rehabilitation Area No. 5
Northside Sewer Relief Tunnel Rehabilitation Area No. 5 1000 750 Southland Holdings

Completed in 2016 by Oscar Renda Contracting, the Northside Sewer Relief Tunnel Rehabilitation Area No. 5 Project consisted of sliplining approximately 3,130 linear feet of 132-inch diameter cast-in-place unlined concrete…

read more
Northside II 48-inch Water Main, Phase 1, Part 2
Northside II 48-inch Water Main, Phase 1, Part 2 1000 750 Southland Holdings

Completed in 2016 by Oscar Renda Contracting, the Northside II 48-inch Water Main, Phase 1, Part 2 Project consisted of approximately 11,600 linear feet of 48-inch water main, 2,480 linear…

read more