Pipeline

Southwest Pipeline “A”
Southwest Pipeline “A” 1000 750 Southland Holdings

Completed in 2002 by Oscar Renda Contracting, the Southwest Pipeline “A” project consisted of approximately 9,500 linear feet of 54-inch steel pipe, with 600 linear feet by 72-inch by tunneling…

read more
Field Scale Wetlands Demonstration Project
Field Scale Wetlands Demonstration Project 1000 750 Southland Holdings

Completed in 2002 by Oscar Renda Contracting, the Field Scale Wetlands Demonstration project consisted of constructing a pump station on the Trinity River, a pipeline to Richland Creek Wildlife Management…

read more
Southwest Pipe Line “B”
Southwest Pipe Line “B” 1000 750 Southland Holdings

Completed in 2002 by Oscar Renda Contracting, the Southwest Pipe Line “B” project consisted of approximately 31,000 linear feet of 48-inch mortar coated steel, with 500 linear feet by 72-inch…

read more
Lake Tawakoni Emergency Repairs
Lake Tawakoni Emergency Repairs 1000 750 Southland Holdings

Completed in 2004 by Oscar Renda Contracting, the Lake Tawakoni Emergency Repairs project consisted of the repair and replacement of approximately 2,000 linear feet of 84-inch pre-stressed concrete cylinder pipe…

read more
Entergy Power Group Transmission Line
Entergy Power Group Transmission Line 1000 750 Southland Holdings

Completed in 2002 by Oscar Renda Contracting, the Entergy Power Group Transmission Line project was a Fast Track Design Build Project with Winn Engineers, consisting of Installing a Pump Station…

read more
M-282 Sanitary Sewer Rehab. And 492 LF of 16” Watermain at Radio Shack
M-282 Sanitary Sewer Rehab. And 492 LF of 16” Watermain at Radio Shack 1000 750 Southland Holdings

Completed in 2004 by Oscar Renda Contracting, the M-282 Sanitary Sewer Rehab. And 492 LF of 16” Watermain at Radio Shack project consisted of approximately 561 linear feet of 48-inch…

read more
Southside II Water Transmission Main
Southside II Water Transmission Main 1000 750 Southland Holdings

Completed in 2002 by Oscar Renda Contracting, the Southside II Water Transmission Main project consisted of approximately 6,900 linear feet of 36-inch B-303 Pipe, in the middle of Frasier St.…

read more
Salado Creek WRC to Dos Rios WRC Interconnect
Salado Creek WRC to Dos Rios WRC Interconnect 1000 750 Southland Holdings

Completed in 2004 by Oscar Renda Contracting, the Salado Creek WRC to Dos Rios WRC Interconnect project consisted of approximately 18,000 linear feet of Hobas pipe, two 15-foot diameter tunnels…

read more
Dallas Force Main
Dallas Force Main 1000 750 Southland Holdings

Completed in 2002 by Oscar Renda Contracting, the Dallas Force Main project consisted of approximately 30,000 linear feet of 16-inch HDPE Pipe. Project utilized a directional drilling rig which was…

read more
Leon Creek, Salado Creek and Dos Rios WRC Modifications Part “B”
Leon Creek, Salado Creek and Dos Rios WRC Modifications Part “B” 1000 750 Southland Holdings

Completed in 2004 by Oscar Renda Contracting, the Leon Creek, Salado Creek and Dos Rios WRC Modifications Part “B” project consisted of many different components such as 2,378 linear feet…

read more