East River Park – Fab
East River Park – Fab https://www.southlandholdings.com/wp-content/uploads/Southland_Holdings_Stacked.png 1000 750 Southland Holdings https://www.southlandholdings.com/wp-content/uploads/Southland_Holdings_Stacked.pngFabricated, painted, and delivered two W24x207 beam bridges. The North bridge is 288′ long, 6-span continuous. The South bridge is 188′ long, 4-span continuous with a 28′ long W12x106 approach…
read more




