Manufacturing

Hinge K. Steel Ballast for SAS – Fab
Hinge K. Steel Ballast for SAS – Fab 1000 750 Southland Holdings

This project involves building, welding and painting 30 angle supports and burning and painting 304 ballast plates for the Bay Bridge. Project Details Owner: Caltrans Location: Oakland, California, United States…

read more
Hoover Dam Bypass – Fab
Hoover Dam Bypass – Fab 1000 750 Southland Holdings

This contract involved the fabrication and delivery of 64 trapezoidal box girders and eight fabricated struts to support the new concrete arch bridge spanning the Black Canyon between the states…

read more
Haynes Generating Station Economizer Inlet Header – Fab
Haynes Generating Station Economizer Inlet Header – Fab 1000 750 Southland Holdings

For this contract American Bridge provided materials, design and fabrication for a 10’ 3/4” outside diameter by 15’ overall length carbon steel economizer head – ASME BPVE Section I. Project…

read more
Hamilton Avenue Bridge – East Bascule Leaf
Hamilton Avenue Bridge – East Bascule Leaf 1000 750 Southland Holdings

Completed the fabrication on the main bridge components, fabricated sidewalk steel and roadway stringers and assembled the east span for this bascule bridge; work was started by another fabricator. Project…

read more
Great Allegheny Passage Riverton Bridge and Ramp – Fab
Great Allegheny Passage Riverton Bridge and Ramp – Fab 215 161 Southland Holdings

Completed in 2008 by American Bridge, the Great Allegheny Passage Riverton Bridge and Ramp – Fab project consisted of the installation of a bike trail on the existing Riverton Bridge,…

read more
Gowanus Expressway Exodermic Grid
Gowanus Expressway Exodermic Grid 1000 750 Southland Holdings

Completed in 1990 by American Bridge, the Gowanus Expressway Exodermic Grid project consisted of emergency structural steel and concrete repairs to the elevated viaduct. Project Details Owner: New York State…

read more
Grand Avenue Railroad Bridge – Fab
Grand Avenue Railroad Bridge – Fab 1000 750 Southland Holdings

This contract involved the fabrication and delivery of plate girders for Illinois Department of Transportation’s Grand Avenue Railroad Bridge. Project Details Owner: Illinois Department of Transportation (IDOT) Location: Franklin Park,…

read more
George Washington BR-Main Towers Protection – Fab
George Washington BR-Main Towers Protection – Fab 1000 750 Southland Holdings

Provided temporary diaphragms, cheese plates, steel troughs and cover plates for the George Washington Suspension Bridge-Main Tower Protection project. Project Details Owner: Port Authority of New York and New Jersey…

read more
George Washington Bridge Deck Replacement – Fab
George Washington Bridge Deck Replacement – Fab 1000 750 Southland Holdings

Rib clamp plates priority repairs, stiffener angles and reinforcing plates; provide drafting, material and labor to fabricate repairs. The materials will be coated with prime cost of paint only. Project…

read more
Fremont Street Bridge Decking
Fremont Street Bridge Decking 1000 750 Southland Holdings

Fabrication of 9,000 SF of grid. Project Details Owner: xx Location: Seattle, Washington, United States Performed as: American Bridge Company Project value: $232,800.00 Completion Date: October 1999

read more