Manufacturing

SAS Cable Bands – Fab
SAS Cable Bands – Fab 1000 750 Southland Holdings

This project involves providing fully detailed fabrication drawings and 16 supplemental cable band collars. Project Details Owner: Caltrans Location: Oakland, California, United States Performed as: American Bridge Company Project value:…

read more
SAS OBG Cable Safety Railing CCO 188 – Fab
SAS OBG Cable Safety Railing CCO 188 – Fab 1000 750 Southland Holdings

This project involves providing fully detailed erection and fabrication drawings and furnishing all required material to build the handrails. Project Details Owner: Caltrans Location: Oakland, California, United States Performed as:…

read more
San Francisco/Oakland Bay Bridge Barrier Transition Plates – Fab
San Francisco/Oakland Bay Bridge Barrier Transition Plates – Fab 1000 750 Southland Holdings

Within this project 22 barrier transition plates were purchased, formed, fabricated, burned to size and detailed for the San Francisco/Oakland Bay Bridge. The scope also included the addition of weld…

read more
Runk Bridge – Fab
Runk Bridge – Fab 1000 750 Southland Holdings

This project involves providing drafting, as well as material and labor to fabricate repairs; the material will consist of a three coat system. Project Details Owner: Pennsylvania Department of Transportation…

read more
Route 9W Bridge Towers
Route 9W Bridge Towers 823 617 Southland Holdings

Fabricated new bridge towers, and shop assembly of 469 ton tower faces, to replace existing towers on Route 9W bridge, Rockland County, New York. Project Details Owner: New York State…

read more
Route 31 Girder Bridge – Fab
Route 31 Girder Bridge – Fab 1000 750 Southland Holdings

Supplied material and labor to fabricate and deliver 361 tons of steel plate girders for a highway bridge. The bridge has five lines of girders with diaphragms. The material is…

read more
Route 3A over Weymouth Back River
Route 3A over Weymouth Back River 1000 750 Southland Holdings

Fabricated, galvanized, and delivered 2086 square meters of 6-inch exodermic tee grid deck for this 366 LF, five-span steel beam bridge. Project Details Owner: Massachusettes Highway Department Location: Hingham-Weymouth, Massachusetts,…

read more
Route 9W Bridge over Washington Street
Route 9W Bridge over Washington Street 812 609 Southland Holdings

This project involved the fabrication and delivery of 44,223 square feet of exodermic grid and 50,600 lbs. of miscellaneous structural steel for bridge repair and re-decking. Project Details Owner: New…

read more
River Street Bridge Fabrication
River Street Bridge Fabrication 911 683 Southland Holdings

American Bridge provided all material and labor associated with fabrication, drafting, painting and shipping complete bridge system consisting of: trusses, floor beams and lateral bracing for this 136 foot long…

read more
Rensselaer St. Bridge – Fab
Rensselaer St. Bridge – Fab 1000 750 Southland Holdings

This project involves fabricating four lines of plate girders, 46’ deep x 195’-6” long (two girders per line with bolted splice) from weathering steel, 27 W33x118 diaphragms and eight galvanized…

read more