Bridges & Transportation

Cross-town Parkway & Turnpike Flyover Bridge
Cross-town Parkway & Turnpike Flyover Bridge 1000 750 Southland Holdings

Completed in 2008, the Cross-town Parkway & Turnpike Flyover Bridge project consisted of the major roadway and flyover bridge construction, including mass clearing & grubbing; excavation, drainage, embankment, MSE walls,…

read more
Lee Roy Selmon Expressway – Deck Replacement
Lee Roy Selmon Expressway – Deck Replacement 1000 750 Southland Holdings

Completed in 2008, the Lee Roy Selman Expressway – Deck Replacement project consisted of the design and construction of bridge deck replacement (three locations) on the Lee Roy Selmon Crosstown…

read more
THEA Emergency Deck Repair
THEA Emergency Deck Repair 1000 750 Southland Holdings

Completed in 2009, the THEA Emergency Deck Repair project consisted of the repair of the bridge deck that was failing. Project Details Owner: Tampa Hillsborough Expressway Authority Location: Tampa, Florida,…

read more
Reedy Creek Fire Station
Reedy Creek Fire Station 1000 750 Southland Holdings

Completed in 2009, the Reedy Creek Fire Station project consisted of asphalt repairs to parking areas. Project Details Owner: Reedy Creek Improvement District Location: Orlando, Florida, United States Performed as:…

read more
Becker Road Extension
Becker Road Extension 1000 750 Southland Holdings

Completed in 2009, the Becker Road Extension project consisted of the accelerated construction of the 4-lane widening of Becker Road extending from the I-95 Interchange, east to Tacoma Street. This…

read more
I-95 @ Becker Road Interchange
I-95 @ Becker Road Interchange 1000 750 Southland Holdings

Completed in 2009, the I-95 at Becker Road Interchange project consisted of the construction of 6-lane tight diamond interchange at Becker Road and I-95. The construction included approximately 1.25 miles…

read more
Canadian Court Utilities
Canadian Court Utilities 1000 751 Southland Holdings

Completed in 2009, the Canadian Court Utilities project consisted of the new road construction and rebuilding an existing roadway at the Intersection of International Drive & Canadian Court. Removal and…

read more
Cross-town Parkway @ I-95 Interchange
Cross-town Parkway @ I-95 Interchange 1000 750 Southland Holdings

Completed in 2009, the Cross-town Parkway at I-95 Interchange project consisted of major roadway and bridge construction of 6-lane diamond interchange at Crosstown Parkway and I-95. Construction included approximately 1.13…

read more
SR 414 and SR 429 Interchange
SR 414 and SR 429 Interchange 1000 750 Southland Holdings

Completed in 2009, the SR 414 and SR 429 Interchange project was a major roadway and bridge project that consisted of approximately 1.7 miles of 6 lane mainline roadway, two…

read more
Osceola Parkway Phase 1 & 1A
Osceola Parkway Phase 1 & 1A 1000 750 Southland Holdings

Completed in 2010, the Osceola Parkway Phase 1 & 1A project consisted of urbanizing existing 2 lane to 4 lane to upgrade the county’s master transportation plan using the CM@Risk…

read more