Bridges & Transportation

Chincoteague Bridge Route 175
Chincoteague Bridge Route 175 1000 750 Southland Holdings

Completed in 2012, the Chincoteague Bridge RT 175 project involved constructing a 4,764’ replacement bridge for Virginia Route 175, including a 4,035’ mainline and a 729’ connector to Marsh Island.…

read more
Columbus Road Lift Bridge
Columbus Road Lift Bridge 1000 750 Southland Holdings

Completed in 2014, the Columbus Road Lift Bridge project involved replacing the existing lift bridge over the Cuyahoga River. Work included a new 250’ main lift span truss, operator and…

read more
Frendship Trail Bridge Demolition
Frendship Trail Bridge Demolition 1000 750 Southland Holdings

Bridge Demolition Project Details Owner: Hillsborough County Location: Tampa, Florida, United States Performed as: American Bridge Company Project value: $11,088,349.00 Completion Date: March 2018

read more
BNSF Railroad Truss Bridge over I-235
BNSF Railroad Truss Bridge over I-235 1000 750 Southland Holdings

Subcontract scope of work included furnishing and installing structural steel for two 950 ton single track railroad trusses, engineering means and methods for truss transportation, and maintenance of traffic. Project…

read more
Bridge #138 on NC-150 over Lake Norman
Bridge #138 on NC-150 over Lake Norman 1000 750 Southland Holdings

Completed in 2014 by American Bridge, the Bridge #138 on NC-150 over Lake Norman project involved the construction of a new bridge, including structural steel installation, deck work, and related…

read more
George Washington Bridge: Upper Level Structural Steel Rehabilitation
George Washington Bridge: Upper Level Structural Steel Rehabilitation 1000 750 Southland Holdings

Completed in 2015 by American Bridge, the George Washington Bridge Upper Level Structural Steel Rehabilitation involved replacing portions of the orthotropic deck with prefabricated, prepaved panels at 79 points. Work…

read more
Spuyten Duyvil Bridge Rehabilitation
Spuyten Duyvil Bridge Rehabilitation 1000 750 Southland Holdings

Construction and scope of work included swing span rehabilitation, mechanical repairs to the wedge system, replacement of the damaged center pivot assembly, and testing of bridge once completed. Project Details…

read more
SR-351.66 Bridge Replacement over Genessee River
SR-351.66 Bridge Replacement over Genessee River 1000 750 Southland Holdings

Completed in 2018 by American Bridge, the SR-351.66 Bridge Replacement over the Genesee River replaced the aging Portageville Bridge, a key rail link between Binghamton and Buffalo. The new 963-foot…

read more
South 10th Street Bridge Rehabilitation (Philip Murray Bridge)
South 10th Street Bridge Rehabilitation (Philip Murray Bridge) 540 405 Southland Holdings

Project involved rehabilitation and dehumidification of a 1,275-foot suspension bridge. Scope of work included main cable and elastometric wrap installation, existing anchorage vault roof reconstruction, roadway and sidewalk reconstruction, concrete…

read more
Tacony-Palmyra Bridge – Bascule Span Mechanical Systems Rehabilitation
Tacony-Palmyra Bridge – Bascule Span Mechanical Systems Rehabilitation 1000 750 Southland Holdings

Project involved rehabilitating the mechanical systems of the double leaf bascule span. Scope of work included replacing several components of the operating machinery, removing and reinstalling four air buffer assemblies,…

read more