Bridges & Transportation

Chesapeake Bay Bridge Tunnel – Bridge Portion
Chesapeake Bay Bridge Tunnel – Bridge Portion 1000 750 Southland Holdings

Completed in 1964 by American Bridge, the Chesapeake Bay Bridge Tunnel – Bridge Portion project consisted of fabricating and erecting two bridges totaling 4,273′: the North Channel Bridge and the…

read more
Chesapeake Bay (William Preston Lane) Bridge II
Chesapeake Bay (William Preston Lane) Bridge II 518 389 Southland Holdings

Completed in 1973 by American Bridge, the Chesapeake Bay (William Preston Lane) Bridge II project consisted of constructing the superstructure for a 32-span, 14,500′ bay crossing, including a 2,950′ suspension…

read more
Castaic Siphons
Castaic Siphons 1000 750 Southland Holdings

Completed in 1971 by American Bridge, the Castaic Siphons project consisted of fabricating and installing welded steel water supply siphons and pipelines from Castaic to Newhall, LA County. Project Details…

read more
Cauca River Bridge
Cauca River Bridge 1000 750 Southland Holdings

Completed in 1916 by American Bridge, the Cauca River Bridge project consisted of constructing a 269-foot through truss swing span bridge over the Cauca River. Project Details Owner: Ferrocarril del…

read more
Chain of Rocks Bridge
Chain of Rocks Bridge 531 398 Southland Holdings

Completed in 1964 by American Bridge, the Chain of Rocks Bridge project consisted of fabricating and erecting a cantilevered through truss bridge. Project Details Owner: Illinois Department of Transportation Location:…

read more
Cart Creek Bridge
Cart Creek Bridge 624 468 Southland Holdings

Completed in 1962 by American Bridge, the Cart Creek Bridge project consisted of erecting a steel through-arch bridge with a 550′ span, suspended 210′ above the canyon floor. The 28′…

read more
Carquinez Strait II
Carquinez Strait II 400 300 Southland Holdings

Completed in 1958 by American Bridge, the Carquinez Strait II project consisted of fabricating and erecting a 3,350′ box chord truss bridge with two 500′ anchor arms, two 1,100′ main…

read more
Carquinez Strait I
Carquinez Strait I 400 300 Southland Holdings

Completed in 1927 by American Bridge, the Carquinez Strait I project involved erecting 3,350′ of back-to-back steel cantilevered through trusses, including two 1,100′ main spans and all approaches. A center…

read more
Cape Fear Memorial Bridge
Cape Fear Memorial Bridge 287 215 Southland Holdings

Completed in 1969 by American Bridge, the Cape Fear Memorial Bridge project consisted of constructing a vertical lift bridge with a 408′ main span and a total length of 3,033′.…

read more
Cape Girardeau Bridge
Cape Girardeau Bridge 344 258 Southland Holdings

Completed in 1928 by American Bridge, the 3,413-foot Cape Girardeau Bridge over the Mississippi River features a 1,342-foot continuous through truss, six 324-foot truss spans, deck girder spans, a concrete…

read more