Blue Bonnet Project – I-820 North Tarrant Parkway
Blue Bonnet Project – I-820 North Tarrant Parkway 1000 750 Southland Holdings

Completed in 2014, the Blue Bonnet Project – I-820 North Tarrant Parkway project consisted of three ASSHTO girder bridges on I-820 with 12,000 linear feet of MSE Walls. Project Details…

read more
Treasure Island – Palm and Capri Bridges
Treasure Island – Palm and Capri Bridges 1000 751 Southland Holdings

Completed in 2015, the Treasure Island – Palm and Capri Bridges project consisted of the construction of the bascule bridge, which is a Four-Leaf Trunnion and Hydraulic Drive System bridge.…

read more
I-210: Cove Lane Interchange and Improvements Route I-210
I-210: Cove Lane Interchange and Improvements Route I-210 1000 750 Southland Holdings

Completed in 2015, the I-210: Cove Lane Interchange and Improvements Route I-210 project consisted of the construction of the Cove Lane extension at grade under elevated I-210. This project included…

read more
Water Control Structure S-405 Rehabilitation and Bridge Retrofit
Water Control Structure S-405 Rehabilitation and Bridge Retrofit 1000 750 Southland Holdings

Completed in 2015, the Water Control Structure S-405 Rehabilitation and Bridge Retrofit project consisted of the installation of a cofferdam to allow for rehabilitation and painting of the gate structure…

read more
Universal – Canal Bridge – Pedestrian Bridge Extension
Universal – Canal Bridge – Pedestrian Bridge Extension 1000 750 Southland Holdings

Completed in 2015, the Universal – Canal Bridge – Pedestrian Bridge Extension project consisted of the continuation of the Pedestrian Garden Walk, involving a 10 foot by 135-foot bridge with…

read more
WCS S-407 Deck Replacement Reedy Creek Improvement District
WCS S-407 Deck Replacement Reedy Creek Improvement District 1000 750 Southland Holdings

Completed in 2016, the WCS S-407 Deck Replacement Reedy Creek Improvement District project consisted of the removal and replacement of two superstructure deck slab units at Water Control Structure S-407.…

read more
Bridge over Kentucky Lake
Bridge over Kentucky Lake 1000 750 Southland Holdings

Completed in 2016, the Bridge over Kentucky Lake project consisted of the $131.5 million replacement of an outdated bridge spanning Kentucky Lake. Construction included a 3,611-foot-long, high-level structural steel bridge…

read more
Taxiway “J” Bridge Reconstruction
Taxiway “J” Bridge Reconstruction 1000 750 Southland Holdings

Completed in 2016, the Taxiway “J” Bridge Reconstruction project consisted of the reconstruction of the Taxiway J Bridge over the George Bean Parkway and right-of-way for the future APM system:…

read more
SR 429 (Wekiva Parkway) from US 441 to North of Ponkan Road
SR 429 (Wekiva Parkway) from US 441 to North of Ponkan Road 1000 750 Southland Holdings

Completed in 2016, the SR 429 (Wekiva Parkway) from US 441 to North of Ponkan Road project consisted of the installation of 18 test piles and 284 concrete piles. Project…

read more
Long Key Bridge – V Piers Replacement
Long Key Bridge – V Piers Replacement 1000 750 Southland Holdings

Completed in 2016, the Long Key Bridge – V Piers Replacement project consisted of the replacement of severely deteriorated V-piers at the 12 expansion joints at the Long Key Bridge…