Aerospace

EELV Concept Development Consulting
EELV Concept Development Consulting 1000 750 Southland Holdings

Completed in 1997 by American Bridge, the EELV Concept Development Consulting project consisted of a preconstruction services contract for design development consulting. Services included scheduling, value engineering, cost estimating, permit…

read more
Convair Missile Launch Facilities
Convair Missile Launch Facilities 1000 750 Southland Holdings

Completed in 1961 by American Bridge, the Convair Missile Launch Facilities project consisted of fabricating and constructing 3,500 tons of missile launch silos. Project Details Owner: U.S. Army Corps of…

read more
Wind Tunnel Test Facilities
Wind Tunnel Test Facilities 1000 750 Southland Holdings

Fabrication and construction of high volume wind tunnels for the forerunner of NASA. Project Details Owner: National Advisory Committee for Aeronautics Location: Cleveland, Ohio, United States Performed as: American Bridge…

read more
Atlas Missile Bases 1-12
Atlas Missile Bases 1-12 1000 750 Southland Holdings

Fabricate and construct Atlas Missile launch canisters. Project Details Owner: U.S. Army Corps of Engineers Location: Ellenbergh Depot, New York, United States Performed as: American Bridge Company Project value: $3,000,000.00…

read more
Aeropropulsion Systems Test Facility
Aeropropulsion Systems Test Facility 1000 750 Southland Holdings

Completed in 1985 by American Bridge, the Aero propulsion Systems Test Facility at Arnold Air Force Base was a $307 million wind tunnel test facility. American Bridge handled the structural…

read more
Air Freight/Passenger Terminal Complex
Air Freight/Passenger Terminal Complex 536 402 Southland Holdings

Completed in 2003 by American Bridge, the Air Freight/Passenger Terminal Complex at Patrick Air Force Base included a 34,750 SF passenger terminal, a 14,905 SF administration building, and a 65,695…

read more
McDonnell Douglas (Now: Boeing) Modifications – SLC 2W
McDonnell Douglas (Now: Boeing) Modifications – SLC 2W 311 233 Southland Holdings

Completed in 1993 by American Bridge, the McDonnell Douglas (now Boeing) Modifications – SLC 2W project involved raising the Mobile Service Tower (MST) by 14 feet, adding a new floor,…

read more
Boeing Delta III Second Stage Test Stand
Boeing Delta III Second Stage Test Stand 801 601 Southland Holdings

Completed in 1998 by American Bridge, the Boeing Delta III Second Stage Test Stand project involved constructing a 37′ steel test stand for rocket assembly, including platform articulation, painting, and…

read more
Boeing LC 17B Modifications
Boeing LC 17B Modifications 1000 750 Southland Holdings

Completed in 1997 by American Bridge, the Boeing LC 17B Modifications project involved retrofitting mechanical systems for hydrogen, oxygen, nitrogen, helium, and propane tanks and piping. New concrete acoustical and…

read more
GOAA BP-359 Airside No. 2 Extension, Wings 7 and 9
GOAA BP-359 Airside No. 2 Extension, Wings 7 and 9 1000 750 Southland Holdings

Completed in 2006 by American Bridge, the GOAA BP-359 Airside No. 2 Extension, Wings 7 and 9 project expanded Airside Two at Orlando International Airport by adding 72,000 SF of…

read more