Aerospace

Vehicle Assembly Building
Vehicle Assembly Building 381 286 Southland Holdings

Completed in 1965 by American Bridge, the Vehicle Assembly Building project consisted of fabricating and erecting a 60,000-ton building for the final assembly of manned spacecraft. The building measures 716′…

read more
US Air Force SLC 4W Modifications
US Air Force SLC 4W Modifications 1000 750 Southland Holdings

Completed in 1993 by American Bridge, the US Air Force SLC 4W Modifications project consisted of reinforcing the structural system, changing the hammerheads, and modifying the entire roof system in…

read more
U.S. Navy Radio Reseach Station
U.S. Navy Radio Reseach Station 1000 750 Southland Holdings

Completed in 1961 by American Bridge, the U.S. Navy Radio Research Station project consisted of the fabrication and construction of a 300-foot diameter radio listening dish weighing 6,005 tons. Project…

read more
Technical Facilities, Titan II
Technical Facilities, Titan II 1000 750 Southland Holdings

Completed in 1963 by American Bridge, the Technical Facilities, Titan II project consisted of constructing support facilities for the experimental Titan II Intercontinental Ballistic Missile. Project Details Owner: U.S. Army…

read more
Technical Facilities, Titan III – Complex 40 and 41
Technical Facilities, Titan III – Complex 40 and 41 1000 750 Southland Holdings

Completed in 1965 by American Bridge, the Technical Facilities, Titan III – Complex 40 and 41 project consisted of constructing launch complexes as part of a $39 million Integrate-Transfer-Launch (ITL)…

read more
Technical Facilities, Titan III – Support Facilities
Technical Facilities, Titan III – Support Facilities 1000 750 Southland Holdings

Completed in 1967 by American Bridge, the Technical Facilities, Titan III – Support Facilities project consisted of constructing the first Integrate-Transfer-Launch (ITL) facility at Cape Canaveral, including two launch complexes…

read more
Space Propulsion Facility
Space Propulsion Facility 1000 750 Southland Holdings

Completed in 1967 by American Bridge, the Space Propulsion Facility project consisted of: – Steel frame assembly building with crane runway, 144′ x 175′ x 97′ high. – Steel frame…

read more
SRB and External Processing Facilities
SRB and External Processing Facilities 1000 750 Southland Holdings

General construction of space shuttle facilities at Vandenberg Air Force Base, California. Project Details Owner: United States Air Force Location: Vandenberg AFB, California, United States Performed as: American Bridge Company…

read more
Seattle-Tacoma International Airport Addition
Seattle-Tacoma International Airport Addition 496 372 Southland Holdings

Additions and renovations at the Seattle-International Terminal (4,808 tons of structural steel). Project Details Owner: Port of Seattle Location: Seattle, Washington, United States Performed as: American Bridge Company Project value:…

read more
NORAD Combat Operation Center
NORAD Combat Operation Center 821 616 Southland Holdings

Completed in 1965 by American Bridge, the NORAD Combat Operation Center project consisted of fabricating and erecting a military operations complex over one mile underground. Project Details Owner: U.S. Army…

read more