Completed in 2012 by Oscar Renda Contracting, the Ward County Water Supply Expansion Project Transmission Pipeline Contract A and B consisted of the installation of approximately 20.9 miles of 48-inch water pipeline, 14.3 miles of 42-inch water pipeline and 6.1 miles of 48-inch water pipeline and site restoration. Traffic control and flagging service for work associated in the city streets. Approximately 25,000 square yards of full width replace and overlay asphalt paving with flexbase subgrade and site restoration. Scope of work included, clearing, grading, excavation for pipeline installation, structural concrete placement, and final restoration.
Project Details
- Owner: Colorado River Municipal Water District
- Location: Odessa, Texas, United States
- Performed as: Oscar Renda Contracting, Inc.
- Project value: $52,732,408.00
- Completion Date: November 2012