TPA Container Terminal Phase II

Completed in 2010 by American Bridge, the TPA Container Terminal Phase II project involved retrofitting 877′ of crane rail extension at the Port of Tampa. The rail sits on a concrete beam supported by 20″ bearing piles and 32” drilled shafts. The dock was excavated, backfilled with limestone and geo grid, and topped with super pave asphalt for unloading containerized cargo.

Project Details

  • Owner: Tampa Port Authority (Port Tampa Bay)
  • Location: Tampa, Florida, United States
  • Performed as: American Bridge Company
  • Project value: $4,666,849.00
  • Completion Date: August 2010