Consisting of the following through pin-connected spans: one double-track draw bridge, 450 ft 3-in c-c; three single-track spans, each 300 ft 0-in c-c; two single-track spans, each 150 ft 0-in c-c. Structure designed to be made double-track throughout by the addition of a third truss on each of the fixed spans. Weight 3,825 tons.
Project Details
- Owner: Illinois Central Railroad
- Location: Gilbertsville, Kentucky, United States
- Performed as: American Bridge Company
- Completion Date: 1905



