T.E.C.O. – Polk Power Station

Completed in 1997 by Johnson Bros. Corporation, the T.E.C.O. – Polk Power Station project consisted of construction site services over a 28-month schedule that included moving 15.5 million cubic yards of muck and earth, dewatered millions of gallons of water daily, poured 32,000 cubic yards of concrete on footings, foundations, and other structures for the power block, installed 63,400 linear feet of piping, built outfall structures, seeded and sodded entire area to complete the site and reclaim project.

Project Details

  • Owner: Tampa Electric Co.
  • Location: Mulberry, Florida, United States
  • Performed as: Johnson Bros. Corporation
  • Project value: $58,000,000.00
  • Completion Date: 1997