Strom Drainage Pipe Repair

Completed in 2002 by Southland Contracting, the Storm Drainage Pipe Repair Project consisted of installing approximately 1,134 linear feet of 42-inch cast-in-place pipe (CIPP) rehabilitation and repair of 160 joint connections and other cracks in the 54-inch pipe.

Project Details

  • Owner: City of Vernon
  • Location: Vernon, Texas, United States
  • Performed as: Southland Contracting, Inc.
  • Project value: $218,207.00
  • Completion Date: January 2002