Completed in 2002 by Johnson Bros. Corporation, the SR 679 Bridge across Bounces Pass to Ft. Desoto State Park project consisted of the construction of a low-level causeway AASHTO bridge replacement over Bounces Pass. The low water level footing system that stripped from the bottom designed in-house, which expedited the schedule. Additional scope of work included piling; concrete; turbidity; rubble rip rap; gabions; maintenance of traffic (MOT); environmentally sensitive area; etc.
Project Details
- Owner: Florida Department of Transportation
- Location: Ft. Desoto, Florida, United States
- Performed as: Johnson Bros. Corporation
- Project value: $7,823,000.00
- Completion Date: January 2002



