SR 679 Bridge across Bounces Pass to Ft. Desoto State Park

Completed in 2002 by Johnson Bros. Corporation, the SR 679 Bridge across Bounces Pass to Ft. Desoto State Park project consisted of the construction of a low-level causeway AASHTO bridge replacement over Bounces Pass. The low water level footing system that stripped from the bottom designed in-house, which expedited the schedule. Additional scope of work included piling; concrete; turbidity; rubble rip rap; gabions; maintenance of traffic (MOT); environmentally sensitive area; etc.

Project Details

  • Owner: Florida Department of Transportation
  • Location: Ft. Desoto, Florida, United States
  • Performed as: Johnson Bros. Corporation
  • Project value: $7,823,000.00
  • Completion Date: January 2002